
Powering On the Switch
84
Figure 36. Switch Initialization Messages (Continued)
After the switch has initialized its management software, go to “Starting a
Management Session” on page 85.
Initializing IFMV6 .................................. done!
Initializing RTM .................................... done!
Initializing FTAB ................................... done!
Initializing FTABV6 ................................. done!
Initializing ACM .................................... done!
Initializing Filter ................................. done!
Initializing L3_MGMT ................................ done!
Initializing L3APP_MGMT ............................. done!
Initializing SFLOW .................................. done!
Initializing NTP .................................... done!
Initializing CPU_HIST ............................... done!
Initializing EStacking .............................. done!
Initializing MGMT_MGMT .............................. done!
Loading configuration file "boot.cfg" ....... done!
Press <ENTER> key to connect...
Summary of Contents for AT-FS970M/16F8-LC
Page 8: ...Figures 8...
Page 10: ...Tables 10...
Page 14: ...Preface 14...
Page 48: ...Overview 48 Figure 17 System LED System ID LED...
Page 62: ...Beginning the Installation 62...
Page 70: ...Installing the Switch on a Table or in an Equipment Rack 70...
Page 78: ...Cabling the Networking Ports 78...
Page 96: ...Troubleshooting 96...