Chapter 2: Installation
40
4. Slide the SFP transceiver into an SFP slot on the switch, as shown in
Figure 10.
Figure 10. Inserting the SFP
5. Repeat steps 2 through 4 if you are installing another SFP transceiver.
Note
SFP transceivers are dust sensitive. When a fiber optic cable is not
installed, or when you store the SFP, always keep the plug in the
optical bores. When you do remove the plug, keep it for future use.
Note
Unnecessary removal and insertion of an SFP can lead to
premature failure.
For information about cabling for the SFP, consult the documentation
that was shipped with the SFP.
798
Summary of Contents for AT-9000/24
Page 1: ...613 000239 Rev A Layer 2 Gigabit Ethernet Switch AT 9000 24 Installation Guide...
Page 6: ...Contents 6 Appendix B Translated Safety Statements 53...
Page 8: ...Figures 8...
Page 10: ...Tables 10...
Page 28: ...Chapter 1 Overview 28...
Page 46: ...Chapter 2 Installation 46...
Page 48: ...Chapter 3 Troubleshooting 48...
Page 52: ...Appendix A Technical Specifications 52...
Page 74: ...Appendix B Translated Safety Statements 74 1 1 2 3 LAN 4 5 6 I 7 8 9 40 C 10 11 15 LAN OFF 12...