AT-x220-28GS Switch Installation Guide
17
Chapter 2
Installation
This chapter contains the following sections:
“Reviewing safety precautions” on page 18
“Selecting a site for the switch” on page 21
“Unpacking the switch” on page 22
“Installing the switch on a table or a desktop” on page 23
“Removing the feet before installing the switch in an equipment
rack or on a wall” on page 25
“Installing the switch in an equipment rack” on page 26
“Installing the switch on a wall” on page 28
“Powering on the switch” on page 33
“Management software” on page 35
“Starting a local management session” on page 36
“Monitoring the initialization processes” on page 37
“Cabling the Network Ports” on page 41
Summary of Contents for AT-220-28GS Series
Page 8: ...vi ...
Page 10: ...viii ...
Page 26: ...Chapter 1 Overview 16 ...
Page 52: ...Chapter 2 Installation 42 ...