
69
Chapter 6
Cabling the Networking Ports and
Powering On the Switch
This chapter contains the following procedures:
“Cabling Twisted Pair Ports” on page 70
“Guidelines to Handling SFP Transceivers” on page 71
“Installing SFP Transceivers” on page 72
“Powering On the Switch” on page 76
“Starting a Local Management Session” on page 79
“Verifying the Switch with AlliedWare Plus Commands” on page 81
Summary of Contents for AlliedWare Plus AT-GS980M/52
Page 8: ...Figures 8...
Page 10: ...Tables 10...
Page 14: ...Preface 14...
Page 46: ...Chapter 2 Beginning the Installation 46...
Page 50: ...Chapter 3 Installing the Switch on a Table or Desktop 50...
Page 53: ...GS980M Series Installation Guide 53 Figure 19 GS980M Switch Orientations in an Equipment Rack...
Page 82: ...Chapter 6 Cabling the Networking Ports and Powering On the Switch 82...
Page 86: ...Chapter 7 Troubleshooting 86...