
GUI reference
R&S
®
ZND
389
User Manual 1173.9557.02 ─ 61
●
A successful calibration supersedes the previous calibration, discarding all previ-
ous system error correction data.
To keep older correction data, you can transfer them to the calibration "Pool" using
the
●
The system error correction data that are determined in a calibration procedure,
are stored in the analyzer. It is possible to retrieve these data using the remote
control command
If external switch matrices are involved, use
instead.
Step 1: Ports
Allows you to define the calibration to be performed and to select the calibration unit to
be used (along with its characterization).
Background and related information
Refer to the following sections:
●
Chapter 4.5.1, "Calibration types"
●
Chapter 4.5.5.3, "Characterization of calibration units"
The layout of the main panel depends on the number of test ports available:
Figure 5-9: Calibration Unit wizard, step 1: Ports
Cal softtool
www.allice.de
Allice Messtechnik GmbH