
Command reference
R&S
®
ZND
1119
User Manual 1173.9557.02 ─ 61
DIAGnostic:SERVice:CALibration:DUE:STATe?
This command returns the state if the calibration is OK or the instrument requires cali-
bration.
Return values:
<State>
NAN
Not a number, e.g. if no due date is set.
OK
Calibration is OK since due date has not expired yet.
EXPired
Calibration due date has expired. Calibration is needed.
Example:
//Return calibration due state
DIAG:SERV:CAL:DUE:STAT?
Usage:
Query only
DIAGnostic:SERVice:CALibration:INTerval?
<Duration>
Queries the recommended calibration interval, set by Rohde
&
Schwarz service.
Parameters:
<Duration>
String indicating the calibration interval (
)
Example:
DIAG:SERV:CAL:INT?
returns
"P1Y"
if the recommended calibration interval is 1 year
Usage:
Query only
Manual operation:
"Recommended Calibration Interval"
DIAGnostic:SERVice:DATE
<ServiceDate>
This command sets the last date and time the instrument was serviced (ISO 8601 for-
mat).
Parameters:
<ServiceDate>
String containing last service date.
Example:
//Return last service date
DIAG:SERV:DATE?
Manual operation:
DIAGnostic:SERVice:STATe?
This command returns the state if the instrument requires service.
Return values:
<ServiceState>
NAN
Not a number, e.g. if no service date is set.
HUMS and service date commands
www.allice.de
Allice Messtechnik GmbH