Rockwell Automation Publication 20P-TG001C-EN-P - February 2018
35
Component Test Procedures
Chapter 2
8. With the digital multimeter set to “diode test”, measure each connection
point on the pulse transformer board that is listed in these tables. If any
of the actual measurements are out of tolerance, replace the pulse
transformer board.
Check the Field SCR/Dual Diode Module (Drives Only)
The field supply consists of a dual pack SCR/Dual Diode module that is
arranged in a single–phase full wave rectifier configuration. Malfunction of
either of these components can cause various responses including field and
velocity-related faults, or blown fuses. The following procedures can be used if
field bridge malfunctions are suspected.
1. Read the General Safety Precautions on page
2. Remove power from the drive (see page
3. Verify that contactor power (if used) is removed.
4. Verify that power to an external field supply (if used) is removed.
5. Check the anode to cathode junction of the field SCR/dual diode
module. With the digital multimeter set to “diode test”, measure the
resistance across the modules. See
on page
on
page
If a low resistance is detected, replace the modules. See Field SCR/Dual
Diode Module and Field Circuit Board Replacement on page
.
If a measurement results in an “infinity” reading, check the fuses at FV1
and FU1 on the bottom of the drive to determine if they are open. See
.
Table 8 - Armature Pulse Transformer Primary Measurements for Regenerative and Non-
regenerative Drives
For SCR
(+) Meter Lead
(-) Meter Lead
Meter Reading
Connector XY Pinout
1/01
XY-8
XY-1
0.41 Ω
4/04
XY-8
XY-4
2/02
XY-8
XY-2
5/05
XY-8
XY-5
3/03
XY-8
XY-3
6/06
XY-8
XY-6
Table 9 - Armature Pulse Transformer Primary Measurements for Regenerative Drives
For SCR
(+) Meter Lead
(-) Meter Lead
Meter Reading
Connector XY Pinout
1
XY-7
XY-1
0.41 Ω
4
XY-7
XY-4
2
XY-7
XY-2
5
XY-7
XY-5
3
XY-7
XY-3
6
XY-7
XY-6
10
.
.
.
.
.
1
10
.
.
.
.
.
1