Rockwell Automation Publication 6300B-UM002A-EN-P - October 2020
17
Chapter 2 Install the Wall Mount Box PC
Power Consumption
The following table shows the power consumption in watts of various
components in VersaView 6300B wall mount box PCs.
Install the Ground Wire
1.
Turn off the main power switch or breaker.
2. Remove the supplied nut, eyelet terminal, and washers from the
ground screw.
3. For earth ground, fasten a 2.5 mm
2
(14 AWG) or larger external wire to
the eyelet terminal.
Use a ground wire with an insulation color that is approved by local
inspection authority.
4. Install the ground wire to the ground screw in the following sequence.
5. Tighten the nut to the ground screw.
Connect Power
Component
Description
Power
(W)
Component
Description
Power
(W)
Motherboard
—
10.5
USB ports
2.0 Type A, each port
2.5
Processor
Intel Core i3-7100E
45.8
3.0 Type A, each port
4.5
Intel Core i7-7820EQ
58.8
Memory card
CFast SATA
1.3
SSD
mSATA2
2.0
Ethernet
10/100/1000 Mbps
1.3
2.5-in. SATA MLC
5.2
RAM
4 GB
3.9
Serial port
RS-232 DB9M
1.3
8 GB
4.6
Expansion slot PCI half-size or PCIe x4
6.5
(1)
(1)
5W is the maximum that the card can use.
16 GB
5.9
32 GB
8
WARNING:
Do not exceed 120 W for the total system configuration. Power consumption
greater than 120 W can overpower the external and internal power supplies, which can
lead to component damage or, in extreme cases, electrical fires.
Sequence
No.
Description
Sequence
No.
Description
1
Toothed washer
4
Lock washer
2
Eyelet terminal
5
Nut
3
Washer
1
2
3
4
5
ATTENTION:
When you connect power to the computer for the first time, these
actions occur:
• The default UEFI setting automatically starts the computer after it is plugged into a
power source.
• For VersaView 6300B wall mount box PCs with a Microsoft Windows operating
system (OS), you must read and accept an End User Setup procedure.
Do not disconnect power from the system until after the Windows Setup
procedure is completed. If power is disconnected during this procedure, it can
result in a corrupted system image.