ALIMAK 34790 - 1/01
G
7
Foundation pit
The foundation pit is made as follows:
1. Make a concrete slab with additional vertical reinforcement for
the pit walls, see figure. (Identical to one for a concrete slab
level with the ground and for the hoist model in question).
2. When the base slab has cured, add the horizontal reinforce-
ment, followed by formwork and completion of the walls of
the foundation pit.
Vertical reinforcement to be fixed
all around the slab
75
(3 in.)
75
75
75