TORREXX TABLE of CONTENTS - Continued
4. OPERATION
GENERAL
4-19
OPERATING INSTRUCTIONS
4-19
STARTING THE VAPORIZER
4-20
STOPPING THE VAPORIZER
4-20
PURGING THE VAPORIZER
4-20
5. MAINTENANCE
GENERAL
5-22
INITIAL INSTALLATION AND OPERATION INSPECTIONS
5-22
ANNAUL MAINTENANCE REQUIREMENTS
5-23
CONTACTOR INSPECTION
5-24
Liqui-SAFE
TM
VALVE – PERFORMANCE CHECK (6 MONTHS)
5-25
Figure 10 – Steps to check the Liqui-SAFE
TM
valve operation
5-25
Liqui-SAFE
TM
VALVE – SERVICE INSTRUCTIONS
5-26
Figure 11A – STEP 1 – Be sure that the Liqui-SAFE
TM
valve
is at the close position as shown
5-26
Figure 11B – STEP 2 – Unscrew reset button base and remove spring
5-26
Figure 11C – STEP 3 – Replace button post internal o-ring
5-27
Figure 11D – Full hook o-ring tool
5-27
Figure 11E – STEP 4 – Unscrew valve latch body
5-27
Figure 11F – STEP 5 – Replace valve body static o-ring
5-28
Figure 11G – STEP 6 – Replace valve seat and valve stem base o-rings
5-28
6. TROUBLESHOOTING
TROUBLESHOOTING TREES
6-29
FULL LOAD VOLTAGE CHECK
6-35
Figure 12 – Full load voltage check
6-35
FULL LOAD CURRENT CHECK
6-36
Figure 13 – Full Load Current Check
6-36
TORREXX ELECTRIC VAPORIZER DATA SHEET
6-37
HEATER CORE RESISTANCE
6-38
Figure 14 – Heater Core Resistance Wiring Connections
6-38
SOLENOID VALVE LEAK TEST
6-39
Figure 15 – Solenoid Valve Leak Test Components
6-39
TORREXX TABLE of CONTENTS - Continued
Summary of Contents for TORREXX TX100
Page 8: ......
Page 56: ...APPENDIX A TECHNICAL INFORMATION ...
Page 65: ......
Page 66: ......
Page 67: ......
Page 68: ......
Page 69: ......
Page 70: ......
Page 71: ......
Page 72: ......
Page 73: ......
Page 74: ......
Page 83: ...ASCO Valve used by Algas SDI ...
Page 86: ...ASCO Valve used by Algas SDI ...
Page 87: ......
Page 88: ......
Page 89: ......
Page 90: ......