5.

 

FIRST BOILER COMMISSIONING  

 
The first boiler commissioning must be performed exclusively by an authorized person, otherwise the warranty becomes 

invalid. 

INSTRUCTIONS FOR THE SAFETY OF PERSONS, ANIMALS OR PROPERTY 
We want to draw attention of installers to some procedures to be followed so that proper installing of pellet boilers could 

be guaranteed. It is necessary to comply with the required standards, but they themselves are not sufficient. For detailed 
information, read the rest of the instructions for use, maintenance and installation. 

 

Connect the pellet boiler to the power grid. 

 

Do not allow children and animals near the boiler. 

 

Only use pellet with guaranteed quality and do not use other fuels. 

 

Inform all users of any possible risks and hazards, then inform them on how to use the pellet boiler. 

 

If the boiler is placed on a wooden floor, insulate it appropriately. 

 

The pellet boiler works in such a way that some vacuum is generated in the combustion chamber, so make sure that the 

flue gas outlet is thermally sealed. 

The paint releases unpleasant odors at first commissioning (at least 1 hour of operation of the boiler), so it is necessary 

to ventilate the room well. 

 

6.

 

SAFETY WARNINGS  

 

6.1.

 

SAFETY WARNINGS FOR SERVICE PERSONELL  

In addition to the general safety regulations, the person engaged in maintenance should also observe the following: 

 

Always use safety and personal protection equipment as determined by the Directive 89/391/EZ. 

 

Make sure that the power supply is disconnected before beginning any activity. 

 

Always use proper tools. 

 

Before starting any intervention on the boiler, especially before coming into contact with the boiler make sure that 

the boiler and ashes in it are cold. 

 

THE PELLET BOILER IS CONSIDERED UNUSABLE EVEN IF ONLY ONE SAFETY DEVICE IS DEFECTIVE, IMPROPERLY 
REPAIRED OR IF IT IS NOT WORKING! 

 

Do not make any modifications for any reason, except with the permission of the manufacturer or an authorized 
person. 

 

Always use only the original spare parts. Do not wait for the boiler parts to be worn out before replacing them. 
Replace the worn-out parts before they stop working completely, thus preventing damage due to sudden failure of a 
component, which may seriously endanger the safety of persons and/or your property. 

 

Clean the firebox and the space underneath it when cleaning the ashes. 

 

6.2.

 

SAFETY WARNINGS FOR USERS  

The room where the pellet boiler is or will be installed should be designed in accordance with local, national and 

European standards. 

The pellet boiler is a combustion device. During operation, some parts may heat up to very high temperatures. 
The pellet boiler is a class C1 appliance designed to burn only wood pellets (pellets with a 6 mm diameter, maximum 30 

mm in length and of moisture content of up to 10%), i.e. C1 fuel (wood pellets) in accordance with the EN Standard 14961-2. 

 

CHILDREN MUST NOT APPROACH IT OR PLAY WITH BOILER WHILE IN OPERATION! 
The following precautions are recommended during operation of the boiler: 

 

DO NOT approach or touch the combustion chamber door during the boiler operation. There is a RISK OF BURNS. 

 

DO NOT approach or touch the flue pipe during the boiler operation. There is a RISK OF BURNS. 

 

DO NOT perform any cleaning of the heating installation during the boiler operation. 

 

DO NOT open the firebox door during the boiler operation, it will function properly only when the door are 

hermetically closed. 

 

DO NOT remove the ashes during the boiler operation. 

 

DO NOT allow children and animals to approach the pellet boiler. 

 

FOLLOW THE INSTRUCTIONS FROM THIS DOCUMENT 

Follow the following advice for correct use of the boiler: 

 

Only use the fuel recommended by the boiler manufacturer. 

 

Follow the maintenance instructions. 

 

Clean the firebox after spending the pellet tank (3 to 14 days, only when the boiler and the ashes are cold). 

 

DO NOT use the pellet boiler in case of a failure or other defects, unusual noises and/or if you suspect there has 

been a failure. Contact the authorized service IMMEDIATELY. 

 

DO NOT pour water on the boiler or extinguish fire in the combustion chamber with water. 

 

DO NOT lean on the boiler since it may not be sufficiently stable and could be capsized. 

 

DO NOT use the pellet boiler as support or for supporting other object. Do not leave the pellet tank cover open. 

 

DO NOT touch the painted parts of the boiler during operation. 

 

DO NOT use wood or coal for the pellet boiler, only use pellets of the following characteristics: 

dimensions: 6 mm diameter 

CAUTION 

CAUTION 

Summary of Contents for Grande 37 Lux

Page 1: ...37 Lux Instruction for use maintenance and installation This product meets the requirements of the Ecodesign Directive in terms of efficiency and air pollution level in order to contribute to the red...

Page 2: ...by a person authorized by Alfa Plam The flame that develops in the boiler during normal combustion of wood biomass releases just the amount of carbon dioxide CO2 that would be released by natural wood...

Page 3: ...CE 10 8 IMPORTANT SAFETY INFORMATION 11 9 PELLET QUALITY IS VERY IMPORTANT 11 9 1 PELLET STORAGE 11 10 BOILER CONTROL SYSTEM 11 10 1 Electrical connection diagram 12 10 2 Touch screen control panel di...

Page 4: ...ents and or damage occurred due to use of non original or inappropriate spare parts Installations is solely within the responsibility of the installer 2 1 MAIN USER RESPONSIBILITIES The boiler user mu...

Page 5: ...ommissioning inspect the operation during at least 30 minutes in order to check whether all requirements have been met After finishing the installation the installer should provide the customer with t...

Page 6: ...the 80 mm flue pipe Therefore make sure that the flue pipe is completely sealed Carefully analyze the position and condition of the space through which the flue passes If the flue pipe passes through...

Page 7: ...ent always turned upward Figure 4 We recommend not making long horizontal sections for the flue connection If there is no other possibility the flue pipes should not have a downward slope but upward t...

Page 8: ...7 AISI 316 steel flue with double insulated chamber material resistant to 400 C Optimal efficiency 100 Waterproof flue with double insulated chamber and outer casing of light concrete Optimal efficien...

Page 9: ...ng devices such as a hoods hair dryers fans etc located in the room with the boiler combustion air fresh air must be supplied from outside In any case this should be discussed with the competent chimn...

Page 10: ...e universal ones Check if the valve is easily opened check with a finger so that it could be opened with the pump s power The non return valve is placed behind each pump If there are multiple pumps yo...

Page 11: ...nting damage due to sudden failure of a component which may seriously endanger the safety of persons and or your property Clean the firebox and the space underneath it when cleaning the ashes 6 2 SAFE...

Page 12: ...to the following safety rules Turn the pellet boiler off before beginning any procedure Make sure that the ash is cold before beginning any procedure on the boiler Vacuum the ashes deposited in the c...

Page 13: ...ONS ENSURE THE MAXIMUM OUTPUT OF THE BOILER AND THE TEMPERATURE OF THE SYSTEM Make sure that the pellet boiler and ashes are cold For complete weekly cleaning or after 200 kg of used pellets whichever...

Page 14: ...he type and quality of the pellets The manufacturer is not in any way responsible for poor performance of the boiler due to the use of poor quality pellets If sawdust or small decomposed pellets are p...

Page 15: ...isplay 1 2 Start screen display 2 2 YELLOW GREEN POWER CABLE FLUE GAS FAN TURBULATOR REDUCER PRIMARY AIR FAN LIGTER AUGER REDUCER THERMOMETER MANOMETER PENDULUM REDUCER PUMP MICRO SWITCH 1 MICRO SWITC...

Page 16: ...Auger Auger on off Pump Pump on off Valve Pendulum reducer on off V2 Room fan on off V3 Turbulator reducer on off A1 Heater igniter on off A3 Pendulum reducer on off A5 Auger reducer blocked not bloc...

Page 17: ...ition failure Er15 Power outage longer than 50 minutes Er16 Communication error RS485 Er17 Airflow regulator error Er18 No pellet Er25 Firebox cleaning motor error Er26 Turbulator cleaning motor error...

Page 18: ...es Boiler Thermostat The adjustable boiler water temperature range is from 40 C to 80 C By setting the temperature of the water in the boiler the user sets the operating condition of the boiler i e th...

Page 19: ...the steps decreases and increases the calibrated auger speed Fan Calibration menu for changing the speed of the flue gas fan The system has 15 calibration steps from 7 to 7 the factory setting is 0 Th...

Page 20: ...s is performed during the check up phase During this phase the flue gases motor is working at maximum speed while the auger and the igniter are turned off The check up phase takes a few seconds and th...

Page 21: ...ases temperature exceeds 230 C or when the boiler water temperature reaches 85 C During this phase the pellet feed stops until the flue gases temperature is below 230 C or the water temperature in the...

Page 22: ...ck error Internal clock problems Turn the appliance off and then on in the ON OFF menu Check the accuracy of the set time Insufficient internal battery capacity Check the accuracy of the chrono mode p...

Page 23: ...t and cleanliness Contact the service NOTE If the recommended solution fails to remove the direct cause of the alarm CONTACT ALFA PLAM CALL CENTER or the closest authorized service 11 INFORMATION ON B...

Page 24: ...8 Flue gas temperature value at reduced power C 70 Mean NOx value at 10 O2 at rated power mg m3 191 Mean CO value at 10 O2 at rated power mg m3 26 Mean dust emission value at 10 O2 at rated power mg m...

Page 25: ...d floor heating Note If only floor heating is connected to the boiler make sure to install an accumulation tank BUFFER Legend 1 Pellet boiler 2 Air vent 3 Safety valve 3 bar 4 Three way mixing valve w...

Page 26: ...draulic installation diagram accumulation tank Legend 1 Pellet boiler 2 Air vent 3 Safety valve 3 bar 4 Air vent 5 Circulation pump 6 Three way mixing valve with pipe thermostat 7 Accumulation tank BU...

Reviews: