4
If the plates have been removed, insert them
in alternate directions and with the gaskets
turned towards the frame plate or pressure
plate as specified on the plate hanging list.
Use the marked line that was made when the
heat exchanger was opened, refer to step
on page 36 in
5
If the plate pack has been marked on the
outside, check this (see step
on page 34). If the plates are
correctly assembled (A/B/A/B etc.), the edges
form a “honeycomb” pattern, see picture.
6
Press the plate pack together. Position the
four tightening bolts according to the
figure.Tighten the four bolts (1), (2), (3), (4)
until the plate pack measure is 1.10×
A
making sure the frame plate and pressure
plate are parallel when closing.
1
4
3
2
200000423-1-EN-GB
40
6 Maintenance
EN
Summary of Contents for M line TS6
Page 6: ...7 Storage of the heat exchanger 45 7 1 Storage in packing box 45 7 2 Taken out of service 46 ...
Page 10: ...200000423 1 EN GB 10 2 Safety EN Safety ...
Page 18: ...200000423 1 EN GB 18 3 Description EN ...
Page 28: ...200000423 1 EN GB 28 5 Operation EN ...