4.4 Unpacking the crate
Follow the procedure for the corresponding type of crate::
• Manufactured sides — See Procedure
• Crafted sides — See Procedure
Unpacking area
The minimum unpacking area must be at least twice the size of the largest
crate.
When the crate is removed but the equipment is still assembled with the pallet,
remove any loose parts or smaller parts assembled with the pallet.
Equipment can be assembled with the pallet with plastic bands or with screws.
Plastic bands are cut off. Screws are removed.