
3.7 Major Service (MS), assembly
3 Dismantling/Assembly
124
3.7
Major Service (MS),
assembly
3.7.1
Introduction
Before starting the assembly first carry out the
Intermediate Service check points starting on
page
and Major Service check points starting
on page
.
When mounting some of the ball bearings and
bearing housings on the bowl spindle and worm
wheel shaft as described in this chapter, these
must be heated in oil to max. 125 °C.
NOTE
Renew all parts included in the IS- and MS-
kits. The O-rings and other sealing rings
should be lubricated with grease of silicone
type.
WARNING
Burn hazard
Use protective gloves when handling the
heated bearings.
NOTE
If any doubt how to mount roller bearings in a
correct way, see the detailed description in
chapter
‘‘2.7.1 Ball and roller bearings” on
.
Summary of Contents for AFPX 617XGV-14/74CG
Page 1: ...0 5 0 0 E 0 DVcgZTV RZ_eV_R_TV R_fR DVaRcRe c 27AI I8G 48 a SdRc 1 Z ATe...
Page 6: ...6...
Page 8: ...8...
Page 14: ...1 Safety Instructions 14...
Page 46: ...2 7 Common maintenance directions 2 Maintenance Directions 46...
Page 103: ...103 3 Dismantling Assembly 3 5 Major Service MS dismantling...
Page 148: ...148...
Page 150: ...150...
Page 154: ...154...