background image

Installation Instructions

GP-IO-332, GP-IO-332-E

© Honeywell 

    Page 1 - Printed in USA

LT-GP-II-01  Rev. A

LT-GP-II-01

Before you begin

Before installing the GP-IO-332, configure it according to 
the instructions in the Geopoint Hub and I/O Installation 
and Operation Guide (LT-GPIOG) available on the Alerton 
Support Network.

Overview

Warning! 

Always install equipment in accordance with the

instructions and in a manner consistent with electrical codes and
the authority having jurisdiction. Read all instructions before
mounting and wiring.

ATTENTION! 

Installez tout le matériel en conformité avec le

Code national de l'électricité et d'une manière acceptable pour
l'autorité locale compétente. Lisez tout instructions avant
l'installation du matériel. Le non respect des instructions peut
entraîner des dommages matériels ou une situation dangereuse.

The GP-IO-332 is a wireless device that eliminates the 
need for long cabling between a unitary controller and its 
physical I/O. Its multiple inputs and outputs can be 
concentrated onto the BACnet bus by the GP-HUB-100 
receiver. These instructions will help you mount and wire 
the device and then verify that it functions correctly. 

Fig. 1  

GP-IO-332 dimensions in in. (mm). 

Note

The GP-HUB-100 signal receiver has the same

dimensions and mounting holes as the GP-IO-332.

Specifications

Supply Voltage:

24VAC (typical), 50/60Hz. 5VA (max)

Operating Temperature:

-18°C to 70°C (0°F to 158°F)

Operating Humidity:

RH 5% to 95%, non-condensing

Storage Temperatures:

-40°C to 70°C (-40°F to 158°F)

Mounting

Choose a mounting location that reduces interference 
between the GP-IO-332 and the GP-HUB. Some points to 
consider when selecting a location:

The effective communication range is 400 feet through open 
air and 100 feet through two non-metallic walls.

Any metal (ducting, equipment, metal studs, and so on) near 
the device or between two devices will impede radio waves.

If a wall has metal components (studs, ductwork, and so on) 
radio waves will tend to travel along the plane of the wall. 
Mounting the device on the same wall as other device(s) will 
increase signal strength.

When mounting near ductwork or other metal, use 
doublesided tape to mount the device while testing radio 
reception.

Mount the GP-IO-332 indoors or in a weatherproof enclosure.

Important!

Enclosures, if used, must not block 2.4GHz RF. Use

polyester/fiberglass models. If unsure, consult the manufacturer.

DIN rail mounting

To mount the GP-IO-332 on a 35mm DIN rail

1

Hold the device with its top tilted toward the DIN 
rail and then hook the two top tabs on the back of 
the device onto the top of the DIN rail.

2

Push down and in to snap the connector onto the 
rail.

To remove the GP-IO-332 from a DIN rail, push straight up 
from the bottom to release the top tabs and then pull the 
top of the device outward.

Wall mounting

To mount the GP-IO-332 on a wall, position the device in 
any orientation and secure it to the wall with size 6 or 8 
screws appropriate for the mounting surface.

5.50 

(139.6)

5.10 

(129.4)

2.80 (71)

3.51 (89.1)

1.70

(43.3)

0.18 (4.6) MOUNTING HOLES x 4

DIN RAIL

1.4 (35)

Reviews: