Site Preparation
7750 SR-12
Page 41
R
ACK
C
LEARANCE
R
EQUIREMENTS
Allow at least 20-inches in the front and rear of the rack for maintenance access and to allow
space to remove and install SF/CPM, IOMs, MDAs, and air filter in the front and allow space
to remove and install the cooling trays and DC PEMs in the rear.
Figure 6: Chassis Clearance Requirements
FRONT
REAR
20” REAR
REQUIRED FOR MAINTENANCE
20” FRONT
REQUIRED FOR MAINTENANCE