2. UNPACKING AND WAREHOUSING
2.1.
General
The following procedures have been issued and must be observed when unpacking the equipment.
The reciprocal operation must be done for repacking. In such case it is recommended to use the original
packing material.
The following sturdy outer packing material is utilized in order to protect the equipment against mechanical
and climatic stresses to which they are subjected:
wooden crates
for transport by ship, air, on road for periods longer than 60 days
ply-wood crates
for transport by ship, air, on road for periods of 30 to 60 days
cardboard boxes for transport by air or on road for periods of less than 30 days
2.2.
Unpacking
2.2.1.
Preliminary checks
The following information should be printed on the outer crate:
•
International symbols
side up :
keep dry
fragile
•
trade mark/address of the manufacturing company;
•
labels (or templated marks) indicating information on the contract and destination site of the
product;
•
an envelope holding among others the packing list
Upon receipt check:
•
that the final destination of the crates is that indicated on the label;
•
that no damage was made to the cases
Report any shipping damages to the Company’s representative or the Shipping Agent.
Summary of Contents for 1660SM
Page 2: ...8DG 15436 BAAA Ed 03 2 140...
Page 12: ...ED 03 8DG 15436 BAAA 12 140 This page is intentionally blank...
Page 22: ...ED 03 8DG 15436 BAAA 22 140 Figure 5 Use of the extraction tools...
Page 30: ...ED 03 8DG 15436 BAAA 30 140 Figure 13 19 fan shelf...
Page 58: ...ED 03 8DG 15436 BAAA 58 140 Figure 30 Cable assembly for STM 1 Electrical module ICMI...
Page 120: ...ED 03 8DG 15436 BAAA 120 140 This page is intentionally blank...
Page 126: ...ED 03 8DG 15436 BAAA 126 140 This page is intentionally blank...
Page 130: ...ED 03 8DG 15436 BAAA 130 140 This page is intentionally blank...