............................................................................................................................................................................................................................................................
Overview
Installation checklist
E - 8
365-372-304R7.1
Issue 1, November 2007
Part III: “1665 Data Multiplexer (1665 DMX) ring setup and testing”
Chapter 6, “Ring setup and
testing: integration
procedures”
Fiber installation procedure (p. 6-5)
Optical transmission test (OC-192, OC-48,
OC-12) (p. 6-11)
Transmission test procedure (p. 6-11)
Automatic protection switching test (p. 6-12)
Main OLIU switch test (p. 6-12)
Manual switching tests (p. 6-14)
Manual switching test procedure (p. 6-14)
Yes
Function units/growth slots, switching test (p.
6-15)
Notes:
1. Only required if equipped.
Section and Chapter
Procedure
Required
Completed
Yes
No
Summary of Contents for Data Multiplexer Explore 1665
Page 8: ... Contents v i i i 365 372 304R7 1 Issue 1 November 2007 ...
Page 12: ... List of figures x i i 365 372 304R7 1 Issue 1 November 2007 ...
Page 16: ... List of tables x v i 365 372 304R7 1 Issue 1 November 2007 ...
Page 24: ... About this document x x i v 365 372 304R7 1 Issue 1 November 2007 ...
Page 272: ... Final operations Operational tests 5 2 2 365 372 304R7 1 Issue 1 November 2007 ...
Page 326: ... Cleaning pluggable optics modules Fiber cleaning B 1 4 365 372 304R7 1 Issue 1 November 2007 ...
Page 408: ...I N 4 365 372 304R7 1 Issue 1 November 2007 Index ...