Equipment Rack
The router must be installed in an equipment rack. The router cannot operate from a tabletop
or floor.
The 7750 SR-a chassis are designed to be front mounted and installed in an EIA-310 standard
19-in. (482.6 mm) equipment rack.
The chassis have integrated mounting flanges for front-mount installation in a 19-in.
(482.6 mm) rack. The rail mounting holes in the equipment rack must align with the
mounting holes on the chassis mounting flanges.
shows the dimensions of the rack.
Warning:
•
Ensure that you follow the equipment rack manufacturer’s instructions for correct rack
installation.
•
Ensure that you comply with the location requirements outlined in
. Failure to comply with these requirements may impede
correct airflow and may result in the system overheating.
Summary of Contents for 7750 SR-a4
Page 8: ...Table of Contents 8 7750 SR a4 and SR a8 Installation Guide...
Page 12: ...List of Tables 12 7750 SR a4 and SR a8 Installation Guide...
Page 16: ...List of Figures 16 7750 SR a4 and SR a8 Installation Guide...
Page 22: ...Technical Support 22 7750 SR a4 and SR a8 Installation Guide...
Page 70: ...Safety Standards Compliance Agency Certifications 70 7750 SR a4 and SR a8 Installation Guide...
Page 136: ...Troubleshooting Initial Startup 136 7750 SR a4 and SR a8 Installation Guide...
Page 170: ...44 port 1GigE CSFP SFP MDA a Overview 170 7750 SR a4 and SR a8 Installation Guide...
Page 210: ...Removing and Replacing an Impedance Panel 210 7750 SR a4 and SR a8 Installation Guide...
Page 232: ...2015 Alcatel Lucent All rights reserved 3HE 10231 AAAA TQZZA Edition 01...