Installing the SF/CPM
7450 ESS-7
Page 83
I
NSTALLING
THE
SF/CPM
Install the SF/CPM module
before
installing IOMs. Install SF/CPMs only in lower slots A or B.
Typically, the first SF/CPM module installed in an 7450 ESS-7 chassis assumes the role as active,
regardless of being inserted in Slot A or B. The next CPM installed in the same chassis then
assumes the role as the standby CPM. If only one CPM is installed in the 7450 ESS-7 chassis, it
becomes the active CPM regardless of the slot it is installed in.
When the active CPM is removed for replacement or fails, the standby becomes the active CPM. If
two CPMs are inserted simultaneously (or almost simultaneously) and are booting at the same
time, then preference is given to the CPM installed in Slot A.
NOTE
: Each SF/CPM module has two ejector levers which seat and release the card from the
backplane connectors. During installation, the ejector levers must be positioned inward and then
rotated outward to lock into place. The ejector levers must remain in the locked position while the
card is installed in the chassis.
Figure 27: Installing the SF/CPM Module
SR70008
1
2
4
3
Summary of Contents for 7450 ESS-7
Page 1: ...7450 ESS 7 INSTALLATION GUIDE February 2008 Document Part Number 93 0048 07 01 93 0048 07 01...
Page 6: ...Page 6 7450 ESS 7 Table of Contents...
Page 14: ...Preface Page 14 7450 ESS 7...
Page 28: ...Chassis Features Page 28 7450 ESS 7 Figure 6 7450 ESS 7 DC Power Entry Module SR70022...
Page 36: ...7450 ESS 7 System Installation Process Page 36 7450 ESS 7...
Page 108: ...Installing MDAs Page 108 7450 ESS 7...
Page 116: ...LEDs and Optics Page 116 7450 ESS 7...