![Alamo BUSH HOG RMB 1660 Operator'S Manual Download Page 185](http://html.mh-extra.com/html/alamo/bush-hog-rmb-1660/bush-hog-rmb-1660_operators-manual_2888333185.webp)
MAINTENANCE
RMB 1660 01/22
Maintenance Section 5-11
© 2022 Alamo Group Inc.
MAINTENANCE
Hydraulic Component Maintenance Schedule
PROPER TORQUE FOR FASTENERS
The chart lists the correct tightening torque for fasteners. When bolts are to be tightened or replaced, refer to
this chart to determine the grade of bolts and the proper torque except when specific torque values are
assigned in manual text.
RECOMMENDED TORQUE IN FOOT POUNDS UNLESS OTHERWISE STATED IN THE MANUAL*
NOTE:
These values apply to fasteners as received from supplier, dry or when lubricated with normal engine
oil. They do not apply if special graphitic or molydisulphide greases or other extreme pressure lubricants are
used. This applies to both UNF fine and UNC coarse threads.
Component
Installation
200
400
600
800
1000
1200
1400
1600
1800
2000
2200
Pump Drive Shaft Check and Lubricate
X
X
X
X
X
X
X
X
X
X
X
X
Pump Mounting Bolt torque check (Inspect Daily)
X
X
X
X
X
X
X
X
X
X
X
X
Charge Pump Filter
Installation
X
X
X
Pressure Filter to the Control Valve
Installation
X
X
X
Return Canister Filter Element
Installation
X
X
X
Hydraulic Oil Change
Installation
X
X
Hydraulic Oil Particle Count Testing
X
X
X
X
Hydraulic Tank Breather Filter
Installation
Inspect
Replace
Hydraulic Tank Suction Screen
Installation
Inspect
Inspect
Hydraulic Hose Inspection/Replacement
Installation
Inspect
Inspect
Inspect
Inspect
Inspect
Inspect
Inspect
Inspect
Inspect
Inspect
Inspect
Cooling Fan Clean and Inspect
Daily
Daily
Daily
Daily
Daily
Daily
Daily
Daily
Daily
Daily
Daily
Daily
Check Hydraulic Fluid Level (Inspect Daily)
Daily
Daily
Daily
Daily
Daily
Daily
Daily
Daily
Daily
Daily
Daily
Daily
Mower Blades Replace (INSPECT DAILY)
X
X
X
X
X
X
X
X
X
X
X
Blade Bolts Replace (INSPECT DAILY)
X
X
X
X
X
X
X
X
X
X
X
Blade Bar Assembly Replace
Installation
X
X
Spindle Lube Replacement (INSPECT DAILY)
X
X
X
Spindle Bearing Pre-load Inspection
X
X
X
X
X
X
X
X
X
X
X
X
Mower Debris Guard Inspect/Replace
X
X
X
X
X
X
X
X
X
X
X
X
Pivot Point Lubrication
Daily
Daily
Daily
Daily
Daily
Daily
Daily
Daily
Daily
Daily
Daily
Daily
King Pin Bearing Replacement
Installation
X
Pivot Pin Bearing replacement (Steel)
Installation
X
Pivot Pin Bearing Replacement (Fiber)
Installation
X
X
Inspect Operation And Safety Decals Replace
when faded, torn or missing.
X
X
X
X
X
X
X
X
X
X
X
X
Repeat the Maintenance Schedule based on the hours indicated for the life of the machine
Hours of Operation
Summary of Contents for BUSH HOG RMB 1660
Page 2: ......
Page 10: ......
Page 11: ...Safety Section 1 1 2022 Alamo Group Inc SAFETY SECTION ...
Page 31: ...SAFETY RMB 1660 01 22 Safety Section 1 21 2022 Alamo Group Inc SAFETY Decal Description ...
Page 32: ...SAFETY RMB 1660 01 22 Safety Section 1 22 2022 Alamo Group Inc SAFETY ...
Page 33: ...SAFETY RMB 1660 01 22 Safety Section 1 23 2022 Alamo Group Inc SAFETY ...
Page 34: ...SAFETY RMB 1660 01 22 Safety Section 1 24 2022 Alamo Group Inc SAFETY ...
Page 35: ...SAFETY RMB 1660 01 22 Safety Section 1 25 2022 Alamo Group Inc SAFETY ...
Page 36: ...SAFETY RMB 1660 01 22 Safety Section 1 26 2022 Alamo Group Inc SAFETY ...
Page 37: ...SAFETY RMB 1660 01 22 Safety Section 1 27 2022 Alamo Group Inc SAFETY ...
Page 38: ...SAFETY RMB 1660 01 22 Safety Section 1 28 2022 Alamo Group Inc SAFETY ...
Page 39: ...SAFETY RMB 1660 01 22 Safety Section 1 29 2022 Alamo Group Inc SAFETY ...
Page 40: ...SAFETY RMB 1660 01 22 Safety Section 1 30 2022 Alamo Group Inc SAFETY ...
Page 42: ......
Page 43: ......
Page 69: ......
Page 95: ...Introduction Section 2 1 2022 Alamo Group Inc INTRODUCTION SECTION ...
Page 100: ......
Page 101: ...Assembly Section 3 1 2022 Alamo Group Inc ASSEMBLY SECTION ...
Page 123: ...Operation Section 4 1 2022 Alamo Group Inc OPERATION SECTION ...
Page 175: ...Maintenance Section 5 1 2022 Alamo Group Inc MAINTENANCE SECTION ...
Page 186: ...MAINTENANCE RMB 1660 01 22 Maintenance Section 5 12 2022 Alamo Group Inc MAINTENANCE ...
Page 193: ...MAINTENANCE RMB 1660 01 22 Maintenance Section 5 19 2022 Alamo Group Inc MAINTENANCE ...
Page 194: ... 2022 Alamo Group Inc SEGURIDAD RMB 1660 01 22 Sección de Seguridad 1 31 SEGURIDAD ...
Page 195: ... 2022 Alamo Group Inc SEGURIDAD RMB 1660 01 22 Sección de Seguridad 1 30 SEGURIDAD ...
Page 196: ... 2022 Alamo Group Inc SEGURIDAD RMB 1660 01 22 Sección de Seguridad 1 29 SEGURIDAD ...
Page 197: ... 2022 Alamo Group Inc SEGURIDAD RMB 1660 01 22 Sección de Seguridad 1 28 SEGURIDAD ...
Page 198: ... 2022 Alamo Group Inc SEGURIDAD RMB 1660 01 22 Sección de Seguridad 1 27 SEGURIDAD ...
Page 199: ... 2022 Alamo Group Inc SEGURIDAD RMB 1660 01 22 Sección de Seguridad 1 26 SEGURIDAD ...
Page 200: ... 2022 Alamo Group Inc SEGURIDAD RMB 1660 01 22 Sección de Seguridad 1 25 SEGURIDAD ...
Page 201: ... 2022 Alamo Group Inc SEGURIDAD RMB 1660 01 22 Sección de Seguridad 1 24 SEGURIDAD ...
Page 202: ... 2022 Alamo Group Inc SEGURIDAD RMB 1660 01 22 Sección de Seguridad 1 23 SEGURIDAD ...
Page 203: ... 2022 Alamo Group Inc SEGURIDAD RMB 1660 01 22 Sección de Seguridad 1 22 SEGURIDAD ...
Page 204: ... 2022 Alamo Group Inc SEGURIDAD RMB 1660 01 22 Sección de Seguridad 1 21 SEGURIDAD ...
Page 205: ... 2022 Alamo Group Inc SEGURIDAD RMB 1660 01 22 Sección de Seguridad 1 20 SEGURIDAD ...
Page 206: ... 2022 Alamo Group Inc SEGURIDAD RMB 1660 01 22 Sección de Seguridad 1 19 SEGURIDAD ...
Page 207: ... 2022 Alamo Group Inc SEGURIDAD RMB 1660 01 22 Sección de Seguridad 1 18 SEGURIDAD ...
Page 208: ... 2022 Alamo Group Inc SEGURIDAD RMB 1660 01 22 Sección de Seguridad 1 17 SEGURIDAD ...
Page 224: ... 2022 Alamo Group Inc Sección de Seguridad 1 1 SECCIÓN DE SEGURIDAD ...
Page 225: ......