![Alamo BUSH HOG RMB 1660 Operator'S Manual Download Page 120](http://html.mh-extra.com/html/alamo/bush-hog-rmb-1660/bush-hog-rmb-1660_operators-manual_2888333120.webp)
ASSEMBLY
RMB 1660 01/22
Assembly Section 3-20
© 2022 Alamo Group Inc.
ASSEMBL
Y
RUNNING UP PROCEDURE
1.
Ensure that the rotor control valve is in "STOP" position, start tractor, engage P.T.O. allow the oil to
circulate through the return line filter for about 5 minutes without operation of the armhead control lever.
2.
Operate the armhead levers through their complete range ensuring that all movements are functioning
correctly.
3.
Place the flail head at a safe attitude and move the rotor control to "START" position. After initial fluctuation
the rotor should settle to a steady speed. Increase P.T.O. speed to approximately 360 rpm. and run for a
further five minutes before disengaging and stopping tractor.
4.
Check the hose runs and observe that they are free from any pinching, chafing, straining or kinks. Recheck
the oil level in the tank and top up as necessary.
Do not allow the pump to continue working if the rotor does not turn. Overheating and
serious pump damage to the pump can be caused in a very short time.
5.
After running up the machine, increase PTO speed to approximately 360 RPM. Run machine further for
five minutes before disengaging the PTO and stopping tractor. The reason for this running period under a
no load condition is to thoroughly circulate the oil in the reservoir through the return line filter.
6.
Check the hose runs and observe that they are free from any pinching, chafing, straining or kinks. Recheck
the oil level in the tank and top up as necessary.
REMOVAL FROM TRACTOR
Read carefully before commencing to remove the machine from the tractor.
The order of the following steps must be followed exactly. Disconnecting the top link must be the last operation
prior to driving the tractor away from the machine.
Do not operate quadrant lever or machine controls through the rear cab window while
standing on or among linkage components. Always seek assistance.
1.
Select a firm level site for parking the machine.
2.
Replace parking legs in their sockets and secure in their lowest position.
3.
Raise the machine on the tractor linkage until the weight is taken off the stabilizer.
4.
Remove the lower stabilizer pins.
5.
Unscrew the lift cylinder hydraulic shut-off valve.
6.
Lower the machine to the ground.
7.
Extend the arms and place the flail head on the ground at half reach.
8.
Disengage tractor PTO and remove.
9.
Disconnect stabilizer bars or loosen check chains as applicable.
10. Unbolt the control unit from the mounting bracket remove from tractor cab and stow the levers or switchbox
clear of the ground. For units that have quick attach cables, uncouple the cables and leave the control unit
in the cab of the tractor.
11. Disconnect the stabilizer from the tractor’s top hitch position. Allow the stabilizer to slide along the rail until
it contacts the eccentric stops.
12. Remove draft link pins and drive tractor away from machine.
Summary of Contents for BUSH HOG RMB 1660
Page 2: ......
Page 10: ......
Page 11: ...Safety Section 1 1 2022 Alamo Group Inc SAFETY SECTION ...
Page 31: ...SAFETY RMB 1660 01 22 Safety Section 1 21 2022 Alamo Group Inc SAFETY Decal Description ...
Page 32: ...SAFETY RMB 1660 01 22 Safety Section 1 22 2022 Alamo Group Inc SAFETY ...
Page 33: ...SAFETY RMB 1660 01 22 Safety Section 1 23 2022 Alamo Group Inc SAFETY ...
Page 34: ...SAFETY RMB 1660 01 22 Safety Section 1 24 2022 Alamo Group Inc SAFETY ...
Page 35: ...SAFETY RMB 1660 01 22 Safety Section 1 25 2022 Alamo Group Inc SAFETY ...
Page 36: ...SAFETY RMB 1660 01 22 Safety Section 1 26 2022 Alamo Group Inc SAFETY ...
Page 37: ...SAFETY RMB 1660 01 22 Safety Section 1 27 2022 Alamo Group Inc SAFETY ...
Page 38: ...SAFETY RMB 1660 01 22 Safety Section 1 28 2022 Alamo Group Inc SAFETY ...
Page 39: ...SAFETY RMB 1660 01 22 Safety Section 1 29 2022 Alamo Group Inc SAFETY ...
Page 40: ...SAFETY RMB 1660 01 22 Safety Section 1 30 2022 Alamo Group Inc SAFETY ...
Page 42: ......
Page 43: ......
Page 69: ......
Page 95: ...Introduction Section 2 1 2022 Alamo Group Inc INTRODUCTION SECTION ...
Page 100: ......
Page 101: ...Assembly Section 3 1 2022 Alamo Group Inc ASSEMBLY SECTION ...
Page 123: ...Operation Section 4 1 2022 Alamo Group Inc OPERATION SECTION ...
Page 175: ...Maintenance Section 5 1 2022 Alamo Group Inc MAINTENANCE SECTION ...
Page 186: ...MAINTENANCE RMB 1660 01 22 Maintenance Section 5 12 2022 Alamo Group Inc MAINTENANCE ...
Page 193: ...MAINTENANCE RMB 1660 01 22 Maintenance Section 5 19 2022 Alamo Group Inc MAINTENANCE ...
Page 194: ... 2022 Alamo Group Inc SEGURIDAD RMB 1660 01 22 Sección de Seguridad 1 31 SEGURIDAD ...
Page 195: ... 2022 Alamo Group Inc SEGURIDAD RMB 1660 01 22 Sección de Seguridad 1 30 SEGURIDAD ...
Page 196: ... 2022 Alamo Group Inc SEGURIDAD RMB 1660 01 22 Sección de Seguridad 1 29 SEGURIDAD ...
Page 197: ... 2022 Alamo Group Inc SEGURIDAD RMB 1660 01 22 Sección de Seguridad 1 28 SEGURIDAD ...
Page 198: ... 2022 Alamo Group Inc SEGURIDAD RMB 1660 01 22 Sección de Seguridad 1 27 SEGURIDAD ...
Page 199: ... 2022 Alamo Group Inc SEGURIDAD RMB 1660 01 22 Sección de Seguridad 1 26 SEGURIDAD ...
Page 200: ... 2022 Alamo Group Inc SEGURIDAD RMB 1660 01 22 Sección de Seguridad 1 25 SEGURIDAD ...
Page 201: ... 2022 Alamo Group Inc SEGURIDAD RMB 1660 01 22 Sección de Seguridad 1 24 SEGURIDAD ...
Page 202: ... 2022 Alamo Group Inc SEGURIDAD RMB 1660 01 22 Sección de Seguridad 1 23 SEGURIDAD ...
Page 203: ... 2022 Alamo Group Inc SEGURIDAD RMB 1660 01 22 Sección de Seguridad 1 22 SEGURIDAD ...
Page 204: ... 2022 Alamo Group Inc SEGURIDAD RMB 1660 01 22 Sección de Seguridad 1 21 SEGURIDAD ...
Page 205: ... 2022 Alamo Group Inc SEGURIDAD RMB 1660 01 22 Sección de Seguridad 1 20 SEGURIDAD ...
Page 206: ... 2022 Alamo Group Inc SEGURIDAD RMB 1660 01 22 Sección de Seguridad 1 19 SEGURIDAD ...
Page 207: ... 2022 Alamo Group Inc SEGURIDAD RMB 1660 01 22 Sección de Seguridad 1 18 SEGURIDAD ...
Page 208: ... 2022 Alamo Group Inc SEGURIDAD RMB 1660 01 22 Sección de Seguridad 1 17 SEGURIDAD ...
Page 224: ... 2022 Alamo Group Inc Sección de Seguridad 1 1 SECCIÓN DE SEGURIDAD ...
Page 225: ......