5
3. ASSEMBLY AND INSTALLATION
Assembling the frame
Fitting the mat and installing the springs
Lay the frame sections (Part A) into a circle
with the spring holes facing upwards. Push
all sections together until all are fully mated
together.
Lay the mat flat inside the frame. Make sure the
logo is facing upwards. In order to make the
installation of the jumping mat easier, find the
four rings in the 12, 3, 6 and 9 o’clock position
directly oposite each other and attach four
springs on these locations first. Then continue by
attaching springs to every eighth ring, followed
by every fourth and so on until all springs are
attached.
At first, it may look like the mat won’t fit, it will
however stretch to the correct size when you
finish attaching all springs.
AKROBAT HINT:
Springs can be hard to attach, you will need a little force. Help
yourself by using one spring to pull another towards the frame
holes. Do not forget to wear gloves!
We recommend at least two people to assemble the trampoline. Use gloves to protect your hands from pinch points and
sharp points during assembly. Do not apply excessive force during assembly that will cause damage to the product.
The hole should not accumulate water (in which case the drainage is necessary) and it should be possible to clean during
maintenance.
TOOLS:
You will need a cross-head screwdriver for the retaining wall PVC panels.
Important:
Be sure all spring hooks
are well attached to the frame.
1
2