background image

AITO SAUNA STOVE AK-68 
INSTALLATION INSTRUCTIONS

  

 

1. Technical information

 

 

 
Nominal effect kW 

 
36 

 
Diameter mm 

 
680 

 
Height mm 

 
1390 

 
Weight kg (without stones) 

 
430 

 
Peridotite stones kg 

 
250 

 
Diameter of flue opening mm 

 
150 

 
Center of flue opening from floor mm 

 
1770 
 1) 

 
1) The height to flue opening is valid when the stove is 
at a distance of 50 mm from the wall. 

If the top cover 

of the stove is turned, the height is to be 
measured separately.

 

 

2. Assembly 
 

Minimum distance to a non-flammable wall should be 
5 cm for air space. When installing the lower mantle 
cylinder you can determine the direction of the fire 
chamber. Please note that also the upper cover of the 
stove can be turned as shown in the picture. 
 

The masonry for the ash room and the fire chamber 
should be done with fireproof mortar with a thin seam. 
Follow the assembly drawing on page 3. 
 
After the grates the front piece is put in place. When 
the upper mantle and the rock wool mat have been 
mounted, fill the stone space simultaneously with the 
bricks so the bricks stay upright. Rinse the stones 
before stacking. Put the large stones lowest and not 
very densely so that the fire gets evenly to the whole 
stone space. Put the smaller stones at the top. 
 
Put loose rock wool between the cast iron cover and 
the enameled steel cover. Then mount the upper 
parts. 
 
A masonry sleeve for pipe is delivered with the stove. 
Place the sleeve in the chimney to prevent thermal 
expansion from breaking the joint. 
 
 

 
 
The pipe is connected to the connecting piece  (2210-

391) with the bind (2210-395) so that the shorter end 
of the pipe is towards the stove. 
 
The stove must be connected to a chimney, which 
fulfils the local building regulations. It is recommended 
that the height of the flue is at least 3 m. The flue 
diameter must be minimum ø 15 cm.

 

 

The first heating should be done with half effect and 
the stove should then be allowed to cool, so that the 
bricks and stones settle down. This first heating also 
removes any eventual humidity from the bricks. If the 
upper stones do not become evenly hot, small stones 
are added to the hot spots to get an even draught in 
the whole upper surface of the stone space. 
 

3. List of parts 

 

 

 

 

No. 

Part 

pcs  weight kg

 

 

2230-387 

Cast iron cover 

20 

2230-381 

Front piece for grate 

1,5 

1456 

Grate 243x315mm, cast iron 

2230-385 

Support, cast iron, for elements 1 

1,4 

2230-705 

Precast support elements 

18 

85152 

Fireproof brick 25x114x230mm  62 

1,3 

85154 

Fireproof brick 65x114x230mm  47 

3,5 

5527 

Peridotite stones: 

 

Stone No.1 5-10 cm, package  2 

30 

 

Stone No.2 10-15 cm, 

30 

 

Stone No.3 over 15 cm 

40 

2230-749 

Rock wool mat 

2230-221 

Mantle cylinder, lower 

19 

2230-223 

Mantle cylinder, middle 

2230-222 

Mantle cylinder, upper 

23 

2230-224 

Steel cover 

2230-013 

Ash room door 

2210-391 

Connecting piece for pipe 

2210-393 

Damper (inside connecting pcs)1 

0,6 

5334 

Pipe 60° 

2,5 

2210-395 

Bind (with pipe) 

0,2 

2210-394 

Masonry sleeve (with pipe) 

0,3 

2230-016 

“Löyly” lid 

1,6 

2230-012 

Fire chamber door complete 

16 

 

(fastened to lower mantle)

 

 

Ash scoop 

0,5 

 

Ladle 

0,2 

 

Service hook 

0,2 

 
+ fireproof mortar (not included in the delivery) 

15

 

 

chimney

 

masonry 

masonry

 

sleeve

 

pipe 60°

 

bind

 

stove

 

Reviews: