![AISWEI ASW1000S-S Installation And Operating Instructions Manual Download Page 63](http://html.mh-extra.com/html/aiswei/asw1000s-s/asw1000s-s_installation-and-operating-instructions-manual_2880474063.webp)
Installation and Operating Instructions V00
63
10.7 Tools and torque
Tools and torque required for installation and electrical connections.
Tools, model
Object
Torque
Torque screwdriver, T25
Screws for the cover
2.5Nm
Torque screwdriver, T20
Screw for second protective
grounding connection
1.6Nm
Screws for connecting the inverter
and wall bracket
Flat-head screwdriver,
blade with 3.5mm
Sunclix DC connector
/
Flat-head screwdriver,
blade 0.4×2.5
Smart meter connector
/
/
Stick
Hand-tight
Socket
wrench
Open end of 33 Swivel nut of M25 cable gland
Hand-tight
Open end of 15 Swivel nut of sunclix connector
2.0Nm
Wire stripper
Peel cable jackets
/
Crimping tools
Crimp power cables
/
Hammer drill,
drill bit of Ø10
Drill holes on the wall
/
Rubber mallet
Hammer wall plugs into holes
/
Cable cutter
Cut power cables
/
Multimeter
Check electrical connection
/
Marker
Mark the positions of drill holes
/
ESD glove
Wear ESD glove when opening the
inverter
/
Safety goggle
Wear safety goggle during drilling
holes.
/
Anti-dust respirator
Wear anti-dust respirator during
drilling holes.
/