background image

B.  OEM TOP/DOWN MOUNTING

IMPORTANT!

When using this method of rooftop unit installation, an electric 

heat elment must not be installed.  If an electric heater is to be 

installed, the standard interior frame mounting method must be 

used to allow access to the heater from below.

When  using  this  top-down  installation  method,  the 

vehicle roof must be designed to adequately support and 

securely fasten the rooftop unit.

Confirm that the mounting hole area has been properly 

prepared.

Refer  to 

OEM Ducting Requirements 

for proper duct 

sizing.  The  OEM  ducting  requirement  document  is

 

available

 

at 

www.AIRXCEL.com

.  The rooftop unit must 

be mounted as near to level from front to rear and side 

to side as possible. See Figure 3 for maximum allowable 

degree deviations.

1.

 

Remove  rooftop  unit  plastic  shroud,  retaining  the 

hardware.

2.

 

If needed, install foam gasket strip to bottom of unit 

basepan or to top of roof structure to separate supply 

and return air ductwork.

3.

  Apply silicone to the bottom of the rooftop unit 14 X 14 

gasket and align over the opening in the vehicle roof for 

installation.

4.

  Using  4  mounting  screws  and  sealing  washers, 

run the screws down through the 2 bulkhead flange 

holes, 2 front mounting brackets and into the vehicle 

roof.  Tighten  rear  screws  just  until  the  rear  base 

base pads contact roof surface (assuming a flat roof 

surface.  Large  radius  roofs  may  require  additional 

support  gaskets  provided  by  the  OEM.)  Tighten  the 

front  screws  until  the  unit  gasket  has  been  evenly 

compressed. Use care to 

NOT STRIP

 the screws. See 

Figure 5 and 6.

5.

  Apply silicone to the top of each mounting screw head. 

Re-install the rooftop unit plastic shroud.

V.  ELECTRICAL WIRING

ROUTING 115 VAC WIRING

Following Airxcel’s high voltage wiring specifications and all 

local and national electrical codes, route the roof top unit 115 

VAC supply wiring from its power source to the wirebox.

High Voltage Wiring Specifications based on Minimum 

Overcurrent Protection Device Amperage – (see upper 

unit nameplate)

1.

  U.L. requires copper conductors only with minimum 

#12 AWG when using the minimum recommended 

overcurrent protection device.  Higher rated devices 

or longer wiring runs will require #10 AWG or greater 

copper conductors.

2.

  To prevent voltage drops greater than 10% during 

starting loads, adhere to the following guideline:

 

For  lengths  greater  than  50’,  use  #10  AWG  or 

larger copper conductors.  Match to the overcurrent 

protection device provided.

 

Circuit Protection – Refer to upper unit nameplate.

Electrical Wiring High Voltage Wiring Specification 

is based on Overcurrent Protection Device rated 

higher than the minimum required (see upper unit 

nameplate).

Follow all local and NEC (National Electrical Code) 

for proper sizing of wire AWG based on Overcurrent 

Protection Device selected and the length of the 

wiring run to the Heat Pump.

MOUNT GASKET

ROOFTOP UNIT

ROOF STRUCTURE

MOUNTING BOLT

GASKET

INDICATING

TAB

MOUNTING FRAME

FIGURE 4

4

Summary of Contents for 45000 Series

Page 1: ...CK HAZARD To prevent the possibility of severe personal injury or equipment damage due to electrical shock always be sure the electrical power source to the appliance is disconnected CAREFULLY FOLLOW...

Page 2: ...eat Pump will not operate III SELECTING AN INSTALLATION LOCATION Your Airxcel Inc Heat Pump has been designed for use primarily in recreational vehicles Is the roof of the vehicle capable of supportin...

Page 3: ...ounted as near level from front to rear and side to side as is possible when the vehicle is parked on a level plane Figure 3 shows maximum allowable degree deviations mounting degrees from total surfa...

Page 4: ...fs may require additional support gaskets provided by the OEM Tighten the front screws until the unit gasket has been evenly compressed Use care to NOT STRIP the screws See Figure 5 and 6 5 Apply sili...

Page 5: ...IS AVAILABLE AT www AIRXCEL com IT IS THE RESPONSIBILITY OF THE INSTALLER TO PROVIDE THE MEANS FOR SEGREGATION OF SUPPLY AND RETURN AIR 1 08 16 15 1 98 16 94 47 13 06 REAR BASE PADS DIMENSIONS FROM 14...

Page 6: ...y from carton separate individual items and remove the two grilles and filters from the ceiling shroud B Fasten the duct collar to the Heat Pump basepan with 3 provided screws See Figure 11 C Raise th...

Page 7: ...FIGURE 9 FIGURE 10 7...

Page 8: ...8 ROOFTOP UNIT ROOF STRUCTURE MOUNTING FRAME DUCT COLLAR CEILING ASSEMBLY CHUTE FABRIC DUCT MATERIAL CEILING ASSEMBLY SHROUD CONTROL KNOBS GRILLES FILTERS FIGURE 11...

Page 9: ...andard warranty knowing you have protection for an additional three 3 years should you experience part failure excluding shrouds filters and complete Heat Pumps on your Coleman Mach Heat Pump Free rep...

Page 10: ...n a shaded area keeping windows and doors shut and avoiding the use of heat producing appliances in the vehicle will help to reduce the heat gain When possible the addition of insulation and tinted gl...

Page 11: ...e air is to flow Discharge air temperature can be controlled to some extent by opening or closing the louvers When the louvers are closed the warmest localized discharge air is achieved Fully opened l...

Page 12: ...developing cracks or has suffered damage from impact v WALL THERMOSTAT IDENTIFICATION AND OPERATION If your Coleman Mach roof top unit is controlled by a wall thermostat refer to the operation manual...

Page 13: ...13 THIS PAGE INTENTIONALLY LEFT BLANK...

Page 14: ...sp cialement form et exp riment dans l installation de ce type d quipement et des l ments s y rattachant Dans certains tats on exige que le personnel d installation et d entretien d tienne une licence...

Page 15: ...de chaleur lev songez une meilleure isolation du v hicule installer des auvents au dessus des fen tres ou les faire teinter III S LECTION DE L EMPLACEMENT D INSTALLATION Votre pompe a chaleur Airxcel...

Page 16: ...e doit permettre le passage du c blage d alimentation Acheminez le c blage d alimentation dans le cadre au moment de son installation IMPORTANT Pr voyez 61 cm 24 po de c blage d alimentation travers l...

Page 17: ...tallation 4 l aide de 4 vis de fixation et les rondelles d tanch it ex cutez les vis travers les trous de la bride 2 de cloison 2 avant des supports de montage et dans le toit du v hicule Serrer les v...

Page 18: ...IS AVAILABLE AT www AIRXCEL com IT IS THE RESPONSIBILITY OF THE INSTALLER TO PROVIDE THE MEANS FOR SEGREGATION OF SUPPLY AND RETURN AIR 1 08 16 15 1 98 16 94 47 13 06 REAR BASE PADS DIMENSIONS FROM 14...

Page 19: ...S RIE 9600 Confirmez que vous avez correctement appari la pompe chaleur de toit et l ensemble de plafond Vous devez ex cuter les instructions pas pas dans l ordre qui suit afin d assurer une installa...

Page 20: ...FIGURE 9 FIGURE 10 20...

Page 21: ...ROOFTOP UNIT ROOF STRUCTURE MOUNTING FRAME DUCT COLLAR CEILING ASSEMBLY CHUTE FABRIC DUCT MATERIAL CEILING ASSEMBLY SHROUD CONTROL KNOBS GRILLES FILTERS FIGURE 11 21...

Page 22: ...un trois 3 ans si vous rencontrez d faillance d une pi ce suppl mentaire l exclusion des linceuls des filtres et des pompe a chaleurs complets sur votre air Coleman Mach conditionneur Pi ces de recha...

Page 23: ...23 CETTE PAGE EST INTENTIONNELLEMENT BLANK...

Page 24: ...t et des verres teint s tout particuli rement dans les caravans non isol es IX MODE D EMPLOI ET UTILISATION S RIES 45000 DES CLIMATISEURS DE TOIT DES PL NUM DE PLAFOND REMARQUE Le montage de chauffage...

Page 25: ...chaleur diminue de quelques degr s sous le r glage choisi Lorsque la temp rature de l air qui entre dans le pompe a chaleur augmente au dessus de ce r glage il arr tera le compresseur Le chauffage con...

Page 26: ...rait aussi utile de faire un examen du couvercle de plastique couvrant le pompe a chaleur sur le toit S assurer que les quatre vis de montage et les rondelles sont bien en place et retiennent le couve...

Page 27: ...27 CETTE PAGE EST INTENTIONNELLEMENT BLANK...

Page 28: ...illing out the application below and mailing it with your check or money order for 89 95 to Airxcel Inc P O Box 4020 Wichita KS 67204 A contract will be sent to you within a few weeks You should retai...

Reviews: