INSPECTION AND STORAGE
At the time of receiving the equipment carefully cross check all the elements against the shipping documents in
order to ensure that all the crates and boxes have been received. Inspect all the units for any visible or hidden
damage.
In the event of shipping damage, write precise details of the damage on the shipper’s delivery note
and send immediately a registered letter to the shipper within 48 hours, clearly stating the damage
caused. Forward a copy of this letter to the manufacturer or their representative.
Never store or transport the unit upside down. It must be stored indoors, completely protected from rain, snow etc.
The unit must not be damaged by changes in the weather (high and low temperatures). Excessively high temperatures
(above 60 °C) can harm certain plastic materials and cause permanent damage. Moreover, the performance of
certain electrical or electronic components can be impaired.
CONTENTS OF PARCEL
GENERALITIES
1 - To avoid any damage, this equipment must not be used to supply heating or cooling during building
work.
2 - Check that the voltage, the number of phases and the capacity of the unit comply with the installation
plans.
3 - Check the size of the unit in relation to the plans to ensure that the unit will be installed in the right
location.
4 - After having removed the packing box, take out the suspension kit that is to be found inside the fan
outlet frame.
5 - Before installing the unit, check its height in relation to the available free ceiling height.
6 - Take particular care over the location and routing of the water pipes and the condensate drainage
pipe as well as the electrical wiring. The location and routing of these items must be clearly indicated
on the plans.
7 - It is always advisable for the heat pump installer to consult with all the various entrepreneurs responsible
for the pipe work, partitioning, ceiling and electrical installation on the site.
8 - If necessary, change the direction of the airflow outlet from the front to the side of the appliance, or
vice versa, prior to installing the unit in the ceiling. Refer to the instructions detailed in the section «
AIRFLOW OUTLET MODIFICATION».
9 - We advise the installer to cover the appliances with a plastic sheet to protect it during the final building
work.
This is particularly important if work such as spraying the joists with fire retardant, sanding, spray
painting and plastering has not been completed.
Package contents:
1 appliance
1 suspension kit comprising:
²
4 nuts
²
4 locknuts
²
4 shock mounts
²
4 washers
1 installation manual
Summary of Contents for HRW 07
Page 2: ......
Page 36: ...34...
Page 37: ...APPENDIX ANNEXE ANLAGE ALLEGATO ANEXO APPENDIX ANNEXE ANLAGE ALLEGATO ANEXO...
Page 38: ...APPENDIX ANNEXE ANLAGE ALLEGATO ANEXO II...
Page 40: ...APPENDIX ANNEXE ANLAGE ALLEGATO ANEXO IV SE 4248 N752 3991281 HRW 7 9 12 BMS WIRING DIAGRAM...
Page 44: ......