Re-installation while the outdoor unit need to be repaired
133
Be sure to check the gas leakage.
7. Re-installation while the outdoor unit need to be repaired
7.1. Evacuation for
the whole system
Procedure:
1). Confirm that both the 2-way and 3-way valves are set to the opened position.
2). Connect the vacuum pump to 3-way valve’s service port.
3). Evacuation for approximately one hour. Confirm that the compound meter indicates -0.1Mpa.
4). Close the valve (Low side) on the charge set, turn off the vacuum pump, and confirm that the gauge
needle does not move (approximately 5 minutes after turning off the vacuum pump).
5). Disconnect the charge hose from the vacuum pump.
Summary of Contents for AWAU-YCZ218-H11
Page 24: ...Dimensions Outdoor Units 97 AWAU YCZ536 H11...
Page 29: ...Wiring Diagrams 102 Outdoor Units AWAU YCZ327 H11 7SP091167 AWAU YCZ327 H11 7SP091171...
Page 30: ...Wiring Diagrams Outdoor Units 103 AWAU YCZ430 H11 7SP091168 AWAU YCZ430 H11 7SP091172...
Page 31: ...Wiring Diagrams 104 Outdoor Units AWAU YCZ536 H11 7SP091169 AWAU YCZ542 H11 7SP091173...
Page 107: ...SERVICE MANUAL Multi Splits Series...