9-13
Electrical Diagrams
12-Volt Main Schematic
WARNING: (Service)
BATTERY GROUND BONDS MUST BE
DISCONNECTED BEFORE 12VDC
ELECTRICAL SERVICE FOR BOTH VEHICLE
AND COACH SERVICE.
INSTALL LABEL A/S# 386291 @ BOTH
GROUND BOND LOCATIONS.
CHASSIS
BOND
CHASSIS
BOND
SEE DWG # 953729S11 (J14-1aa)
NET8
SEE DWG # 953729S11, (J14-4d)
PORT
REMOTE
PORT
BTS
PORT
I/O
PORT
USB
SEPARATOR
IGN
COACH
CHASS
CTL BD
GND
SIG
BATTERY
2
+
-
PV
TEMP
BATTERY
1
+
-
2
4
1
3
RV-C
COM
SET
+
-
M5-CB3 (RED)
M5-CB2 (RED)
CBL1 (6Ga.)
SC1c
CBL3 (6Ga.)
150 18Ga. (GND)
IGN
CBL5 (BLK) (3/0Ga.)
CBL4 (3/0Ga.)
150 (GND)
CBL8 (HIGH TEMP. BRAID LOOM)
CBL13 (BLK) (2/0Ga.)
CBL10 (2/0Ga.)
NOTE: ALL BREAKERS INSTALLED WITH "BAT" (COPPER) TERMINAL CONNECTED TO COPPER BAR.
CBL2 (6Ga.)
SC1e
SEE DWG # 953729S11, (M5-CB4)
M5-CB4
SEE DWG # 953729S10, (G12, J5-7 )
150 8Ga. (GND)
CBL6 (3/0Ga.)
CBL7 (8Ga.)
CBL9
CBL11 (3/0Ga.)
GND
NET
CBL12 (3/0Ga.)
ProMaster Interface
Located in the lower part of the Curb Side B-pillar.
(MTA
CONNECTION)
Located in the starter battery
compartment.)
(BRAID LOOM)
Summary of Contents for Rangeline 2023
Page 1: ...2 0 2 3 R a n g e l i n e SCAN ME O w n e r s M a n u a l...
Page 4: ...NOTES NOTES 2023 Rangeline NOTES NOTES...
Page 6: ...2023 Rangeline 1 2 Introduction NOTES NOTES...
Page 26: ...2023 Rangeline 3 12 General Information NOTES NOTES...
Page 28: ...Floor Plans And Specifications 4 2 2023 Rangeline Floor Plan Rangeline...
Page 76: ...2023 Rangeline 7 10 Ram Promaster Van NOTES NOTES...
Page 102: ...Maintenance 9 16 2023 Rangeline 12 Volt Model Schematic SW SW...