
AirVelocity 1500 Installation Guide
DUG01560
Airspan Commercial and Internal Use
30
B Checklist
During installation, review and perform all the steps on this checklist (in the given order). This checklist
is meant for the person who performs the AirVelocity 1500 installation.
Tip:
To make sure you complete all the tasks, detach or print this checklist and use it as a job aid.
After performing, check off each task.
Procedure
Action
Check If Performed
Verify the prerequisites
Verify the site requirements.
☐
Verify the installation requirements.
☐
Verify the tool requirements.
☐
Verify the parts & kits required.
☐
AirVelocity 1500
installation
Assemble rail brackets on AirVelocity unit two
(2) places.
☐
Install the Ceiling mounting plate (as required)
☐
Install AirVelocity 1500 on the Ceiling mounting
plate (as required).
☐
Install GPS antenna
☐
Connect & manage
Cables
Connect to Copper Ethernet (if applicable)
Connect to Fiber Ethernet (if applicable)
☐
Connect power system
Connect power
☐