During initial start-up or start-up after a long period, the oxygen
concentration can be lower than the low concentration alarm and/
or shutdown setpoint and a ‘low concentration’ alarm may exist.
However, the oxygen generator ignores the oxygen concentration
shutdown setpoint for the first 60 minutes after start-up. If the
oxygen concentration after 60 minutes of operation is still below the
low concentration shutdown setpoint, the oxygen generator shuts
down.
The FEED PRESSURE must be above the feed air low pressure
shutdown level specified in this instruction manual for the oxygen
generator to run.
Make sure the POWER lights on the automatic drain valves at the base of the
filter bowls illuminate. Press the manual override buttons on the PARTICULATE
FILTER DRAIN valve and the COALESCING FILTER DRAIN valve, and make sure
air discharges from the drain outlets.
Make sure the exhaust contains no liquid. If liquid discharges,
press the manual override buttons on the drain valves until the
exhaust no longer contains liquid.
The automatic drains on the oxygen generator exhaust periodically
during operation to remove condensate from the filter bowls.
Adjust the automatic drain timer so that the exhaust contains no liquid without
overdrawing the feed air. The typical timing for the drain valve operation is 5 sec
every 10 min.
Press the ‘START’ icon on the Oxygen Generator Control Screen. You may press
the ‘Silence Horn’ icon on the main screen to silence the alarm due to low oxygen
concentration. The ‘Silence Horn’ icon bypasses the horn for 10 minutes.
Open the MANUAL FEED #2 valve (V-2) slightly. The valve should be open no
more than 20-25%. Allow the unit to run this way until the bed pressures reach a
maximum of 55-60 psig each cycle. This will take approximately 5 minutes. Once
this pressure is reached, open the valve so that it is no more than 50% open. Allow
the unit to run this way until the bed pressures reach a maximum of 60-65 psig each
cycle. This will take approximately an additional 5 minutes. Lastly, open the valve
so that it is no more than 75% open. Allow the unit to run this way until the bed
pressures reach a maximum of 70-75 psig each cycle. This will take approximately
an additional 5 minutes.
Summary of Contents for AS-Q
Page 1: ...INSTRUCTION MANUAL ALPHA SERIES AS Q AS Z PSA Oxygen Generators ...
Page 2: ......
Page 10: ......
Page 12: ......
Page 16: ......
Page 32: ......
Page 50: ......
Page 56: ......
Page 74: ......
Page 78: ......
Page 80: ...80 AS Q AS Z Series Instruction Manual AirSep Corporation ...
Page 81: ...AS Q AS Z Series Instruction Manual 81 AirSep Corporation ...
Page 82: ...82 AS Q AS Z Series Instruction Manual AirSep Corporation ...
Page 83: ...AS Q AS Z Series Instruction Manual 83 AirSep Corporation ...
Page 84: ...84 AS Q AS Z Series Instruction Manual AirSep Corporation ...
Page 85: ...AS Q AS Z Series Instruction Manual 85 AirSep Corporation ...
Page 86: ...86 AS Q AS Z Series Instruction Manual AirSep Corporation ...
Page 87: ...AS Q AS Z Series Instruction Manual 87 AirSep Corporation ...
Page 88: ...88 AS Q AS Z Series Instruction Manual AirSep Corporation ...
Page 89: ...AS Q AS Z Series Instruction Manual 89 AirSep Corporation ...
Page 90: ...90 AS Q AS Z Series Instruction Manual AirSep Corporation ...
Page 91: ...AS Q AS Z Series Instruction Manual 91 AirSep Corporation ...
Page 92: ...92 AS Q AS Z Series Instruction Manual AirSep Corporation ...
Page 93: ...AS Q AS Z Series Instruction Manual 93 AirSep Corporation ...
Page 94: ...94 AS Q AS Z Series Instruction Manual AirSep Corporation ...
Page 95: ...AS Q AS Z Series Instruction Manual 95 AirSep Corporation ...
Page 97: ...AS Q AS Z Series Instruction Manual 97 AirSep Corporation ...
Page 98: ...98 AS Q AS Z Series Instruction Manual AirSep Corporation ...
Page 99: ...AS Q AS Z Series Instruction Manual 99 AirSep Corporation ...
Page 100: ...100 AS Q AS Z Series Instruction Manual AirSep Corporation ...
Page 101: ...AS Q AS Z Series Instruction Manual 101 AirSep Corporation ...
Page 102: ...102 AS Q AS Z Series Instruction Manual AirSep Corporation ...
Page 103: ...AS Q AS Z Series Instruction Manual 103 AirSep Corporation ...
Page 125: ...AS Q AS Z Series Instruction Manual 125 AirSep Corporation ...
Page 150: ...150 AS Q AS Z Series Instruction Manual AirSep Corporation ...
Page 151: ...AS Q AS Z Series Instruction Manual 151 AirSep Corporation ...
Page 152: ...152 AS Q AS Z Series Instruction Manual AirSep Corporation ...
Page 172: ...172 AS Q AS Z Series Instruction Manual AirSep Corporation ...
Page 173: ...AS Q AS Z Series Instruction Manual 173 AirSep Corporation ...
Page 193: ...AS Q AS Z Series Instruction Manual 193 AirSep Corporation ...
Page 194: ......
Page 197: ...AS Q AS Z Series Instruction Manual 197 AirSep Corporation ...