airquee Bungee Cord Obstacle AQ4786 Additional Operating Instructions Download Page 1

 

Version 1.0 6/10/16 

 

 

Page 1 of 3 

 

IMPORTANT 

AS OWNER/OPERATOR IT IS YOUR RESPONSIBILITY TO WRITE AND CARRY OUT YOUR OWN RISK 

ASSESSMENTS BEFORE ATTEMPTING TO USE THIS PRODUCT. 

Site survey: 

 

1.  Carry out a survey of the area where the 

‘Bungee Cord Obstacle’ will be located, 

and check for any overhead/underground cables. It’s important that this is carried 
out to avoid ground anchors penetrating underground services, and the 

‘Bungee 

Cord Obstacle’ coming into contact with overhead cables when inflated.    

2.  You  should  provide  an  adequate power  supply  to  the fan,  this  should  adhere  to 

your local power regulations.   

3. 

Check wind speed:

 The industry recommends a maximum wind speed of Force 5 

on the Beaufort scale of 28 - 38 kph (19-24 mph). Force 5 is a fresh breeze when 
small trees in leaf begin to sway. 

 

 
 
 
 
 
 

Reviews: