Airflow AV 100 User Manual Download Page 8

 

 

MANUFACTURER’S WARRANTY 
 

The manufacturer guarantees normal operation of the fan during 24 months after the date of its 
sale through retail network on condition that the rules for its transportation, storage, installation 
and operation are followed. 
 
In case of absence of the entry specifying the date of sale, the warranty period is calculated 
from the date of manufacture.  In case any fan’s malfunction occurs during the warranty period 
through the fault of manufacturer, the respective customer shall be entitled to replacement of 
t

he fan at the manufacturer’s location. 

 
 
 
 
Airflow Developments Limited 
Aidelle House, Lancaster Road, Cressex Business Park, High Wycombe, Bucks H12 3QP 
 
E-mail: [email protected] 
Telephone: +44 (0) 1494 525252.  Facsimile: +44 (0) 1494 461073 
Web: airflow.com 
 

THE ACCEPTANCE CERTIFICATE 
 

The fan complies with the European norms and directives. 
 
Model: 
 
Manufacturing: 
 
 
 
Stamp of the inspector 
 
 
 
Sold 

The name of the trading company, stamp of the shop 
 
 
 
 
 

Date of sale 

 

Summary of Contents for AV 100

Page 1: ...90411215 Issue5 07 13 USERS MANUAL IN LINE MIXED FLOW ...

Page 2: ...operation without switching off mains By the type of protection against electrical shock the fans belong to Class II The degree of protection against access to the hazardous parts and water intrusions is IPX4 Design of the fans is being constantly perfected so some models could differ from other ones described in this certificate THE BASIC TECHNICAL DATA The fans designations their parameters conn...

Page 3: ...3 R P M Consumption current A Power W Launching capacity мF Noise level dBA 3 m Voltage V 50Hz Connection layout AV 100 145 187 2180 2385 0 11 0 21 21 33 27 36 1 230 Fig 2 3 AV 125 220 280 1950 2455 0 18 0 27 23 37 28 37 1 230 Fig 2 3 AV 150 405 520 1680 2460 0 17 0 27 30 60 4 33 34 1 230 Fig 2 3 Type Sizes mm Weight kg D D1 H B L AV 100 96 126 190 165 246 1 5 AV 125 123 136 190 165 246 1 4 AV 150...

Page 4: ...ed to connection of fans to the mains and adjustment of the timer turn off delay time are to be carried only if the mains voltage is switched off RECOMMENDATIONS For horizontal installation of the fan place an air duct with the length of not less than 1m on the suction side for vertical installation of the fan it is necessary to place a valve grille at the suction duct end Connection of the fans i...

Page 5: ...outs of the fan to the stationary wiring are shown on figs 2 3 In case of one speed operation at one speed it is necessary to connect the wire L of the mains to one of the terminals corresponding to the s elected rotation speed LH maximum speed LL minimum speed Speed of the fan is switched using external switch S1 Fan with timer T fig 3 ensures automatic turning off the fan after certain time from...

Page 6: ...Fig 2 Wiring Diagram AV100 AV125 and AV150 ...

Page 7: ......

Page 8: ...y fan s malfunction occurs during the warranty period through the fault of manufacturer the respective customer shall be entitled to replacement of the fan at the manufacturer s location Airflow Developments Limited Aidelle House Lancaster Road Cressex Business Park High Wycombe Bucks H12 3QP E mail info airflow com Telephone 44 0 1494 525252 Facsimile 44 0 1494 461073 Web airflow com THE ACCEPTAN...

Reviews: