Installation Data
1
Locate and secure mount using bolting down holes provided in base plate.
2
Ensure mounts are located in line with the chiller base.
3
If applicable remove compressor enclosure covers to allow access to AV fixing
points on the chiller base.
4
Position the machine using the centrally located stud, which allows the machine to
be bolted down securely.
5
Loosen transit bolts and turn nut 3 clockwise until top plate 6 lifts clear of support
posts. Tighten lock nut 4 when machine is at desired height and level.
ANTI VIBRATION
MOUNTING
CLS Type (Optional)
6
Adjust and lock nuts on transit bolts such that a small (3-5mm) gap is left between
washer and grommet. Refer diagram below.
Mountings must be adjusted incrementally in turn. Do not adjust 1 mount at a time
as this may overload and damage springs.
CAUTION
Do not connect any services until all anti vibration mounts have been
fully adjusted.
20 20
20
20
10
0
14 Ø
BASE PLATE
TOP PLATE
10
0
200
ELEVATION
1
2
3
4
5
6
7
8
9
10
11
12
13
13
5
M16 STUD
M16 STUD
180
-2
10
= =
=
=
COMPONENTS
1
High deflection steel spring
2
Spring pressure plate
3
Height adjusting nut
4 Locking
nut
5
Load bearing supports
6
Load bearing top plate
7
High frequency isolation pad
8
10 dia holding down bolt holes
9
High frequency isolation grommets
10
Steel spring location rings
11 Transportation/restraining
bolts
12 Machine
frame
13
Machine holding stud/nuts