
Therm-X MVHRU HR95
Technical Manual
Page 12 of 59
Version 2.4, 25/09/2020
3.
OPERATIONAL DIAGRAM
Horizontal (side by side) Configuration
PLAN VIEW (TOP)
Vertical (double deck) Configuration
ELEVATION VIEW (ACCESS SIDE)
1
EC plenum fan
2
PHE with bypass damper
3
Panel filter - supply G4+F7, return G4
4
Control panel
5
Condensate collection and disposal (integral trap)
6
Optional post-heating coil
–
Electric, LPHW, WCO or DX
7
Bypass damper
8
Optional electric pre-heating coil
Key:
OTA
- Outside air
SUP
- Supply air
ETA
- Extract air
EHA
- Exhaust air