
REVERSE OSMOSIS
AIR GAP
Model:
Old Part Number:
500 Jefferson Street, Placentia, California 92870 USA • 949-955-3928 • Email: [email protected]
Copyright AIR GAP INTERNATIONAL
Placentia, California
AG110-002
GAP-A-RO, KIT S-B
Doc.#400-0807-001
5. Connect 3/8" OD poly tubing from
your RO unit to AG110-002 inlet port
and 3/8" OD poly tubing from the
AG110-002 outlet port to the drain
pipe. Use provided clamps and
screws to secure tubing. (See FIG
1-5)
4. The AG110-002 must be installed with the "C/L" line
above the sink's rim, sump, floor drain, floor grate, or
standpipe where the discharge tubing is terminated. The
AG110-002must be installed vertically. Secure
AG110-002 with provided mounting screws (See Fig 1-4).
"C/L"
0.857"-0.900"
Critical Level (C/L) marking
Mounting Screws
Fig 1-4
Fig 1-5
3/8” O.D.
Poly tubing
Clamp
1/4” O.D.
Poly tubing