Fig. 20. Removing and Installing the Burner
1
2
3
4
3
5
I-51
A-070336_EN • Rev. A
M
aintenance
Removing and Installing the Burner
Conditions:
î
Fan and air adapter assembly removed, refer
to
“Removing and Installing the Fan and Air
Adapter Assembly” on page I-48.
Tools and material:
î
Wrench, flat, size 13
î
Torque wrench
î
Air compressor
î
Protective gloves
î
Face mask
Removal Procedure:
1.
Release four nuts (
1
) securing the fan plate
(
2
). Remove the fan plate and its hardware.
Retain for reinstallation.
2.
Extract burner tube (
4
) with upper and lower
gaskets (
3
) from the heat exchanger. Discard
the gaskets.
Cleaning and Checks:
1.
Visually check the condition of the burner
tube (
4
).
2.
Wearing protective gloves and a face mask,
clean with compressed air to remove residues.
If it is in bad condition after cleaning, replace it.
OFF
3.
Clean the combustion chamber, see
ing and Cleaning the Combustion Cham-
Installation procedure:
1.
Install new lower gasket (
3
) on burner tube
(
4
) flange.
2.
Install burner tube (
4
) into heat exchanger.
3.
Install new upper gasket (
3
) on burner tube (
4
)
flange.
4.
Place the fan plate (
2
) in position on the studs (
5
).
5.
Install four retained nuts (
1
) on the studs.
Torque first in a crosswise pattern at 3Nm,
then repeat the operation at 6 Nm.
Follow-on tasks:
1.
Reinstall the fan and air adapter assembly,
refer to
“Removing and Installing the Fan
and Air Adapter Assembly” on page I-48
2.
Reinstall all removed access panels, refer
to
“Removing and Installing the Access
3.
Restart the appliance, see