
1-24
Installing the Test Set
Step 7. Power up the System
Step 7. Power up the System
1.
Ensure the available ac power supply meets the Power Source Requirements and the
operating environment meets the Operating Environment Requirements listed below.
2.
Verify that the ac power cable is not damaged, and that the power-source outlet
provides a protective earth contact.
CAUTION
Always use the three-prong ac power cord supplied with this product.
Failure to ensure adequate earth grounding by not using this cord may
cause product damage.
3.
Turn off the PNA.
4.
Connect the ac power cable from the power-source outlet to the ac input on the rear
panel of the test set.
5.
Turn on the PNA and the test set by pressing the ON/OFF button on the front panel
of each instrument.
NOTE
Perform Step 6 ONLY when both of the following are true. Otherwise, skip
to Step 7.
•
Using the Reference channel paths through the test set. See page
1-16 for more information
•
Using a PNA model E8362A/B, E8363A/B, or E8364A/B.
6.
The
Phase-Lock IF Gain Adjustment
adjusts the R Channel receivers ALC gain to
ensure phase lock over the entire frequency range. Refer to
Phase-Lock IF Gain
Adjustment
in the PNA Help system for details.
a.
Ensure the PNA is NOT already in 4-port mode (Step 7).
b.
On the PNA, from the
System
menu, click
Service
, then
Adjustments
, then
IF
Power Source Requirements
Input Voltage Range
100
−
120 Vac
- or -
220
−
250 Vac
Frequency Range
47
−
62 Hz / 400 Hz
Power
40 VA maximum.
Operating Environment Requirements
Operating Environment
Indoor use
Altitude
Operating:
Storage:
0 to 2.0 km (6,560 ft.)
0 to 15.24 km (50,000 ft.)
Temperature
0
°
C to 40
°
C
Maximum Relative Humidity
80% for temperatures up to 31
°
C; decreasing
linearly to 50% for a temperature of 40
°
C