
6-8
N9360A Multi UE Tester GSM Programming Manual
6
Programming Command Summary
Test Sequence : Test Sequence Screen
The following commands are used to set controls and
parameters associated with the screen for a test flow and test
sequence including the attenuations for each traffic channel,
and to set whether or not to execute each of six Pass/Fail tests
in Automatic Test.
Table 6-6 SEQuence Command Summary
Item
Command
Radio System
CONF:SEQ:RFOR<<
W-CDMA|GSM850|GSM900|DCS1800| <<
PCS1900|CDMA2000MC1X|CDMA2000EVDO|OFF
CONF:SEQ:RFOR?
Sequence Number
CONF:SEQ:NO 1|2
CONF:SEQ:NO?
BCCH Channel
CONF:SEQ:BCCH:CHAN <int>
CONF:SEQ:BCCH:CHAN?
Talk Test
TCH Channel
CONF:SEQ:TCH:CHAN <int>
CONF:SEQ:TCH:CHAN?
CONF:SEQ:TCH:CHAN:EXP <<
GSM850|GSM900|DCS1800|PCS1900,<int>
CONF:SEQ:TCH:CHAN:EXP?
BCCH Frequency
CONF:SEQ:BCCH:FREQ <real>
CONF:SEQ:BCCH:FREQ?
Talk Test
TCH Frequency
CONF:SEQ:TCH:FREQ <real>
CONF:SEQ:TCH:FREQ?
CONF:SEQ:TCH:FREQ:EXP <<
GSM850|GSM900|DCS1800|PCS1900,<real>
CONF:SEQ:TCH:FREQ:EXP