Agilent Technologies G4319A Installation Manual Download Page 6

6

Installation Guide: TCD-to-FID Series Connection

1

Carefully remove the preformed thermal insulation from 
around the detector block to expose two screws securing the 
block to the oven top. Remove the screws.

2

Carefully lift the block just enough to expose the vent tube 
support retaining screw.

3

Carefully slide the heater/sensor and Delta PRT sensor 
cartridges out of the block. Sensors (the small cartridges) 
must be handled carefully to avoid breakage.

Adjusting Vent Tubing and Reinstalling the TCD Block

1

Once the TCD block is removed from the oven enough to 
expose the screw securing the vent tube support, or before a 
new TCD block is installed into the top of the oven, remove 
the retaining screw securing the vent tube support and 
remove the support.

2

Carefully bend the vent tube downwards to be alongside the 
detector column / make up gas fitting. Align the tube so it fits 
into the small slot provided in the oven liner. Reinstall vent 
tube support with reversed orientation.

3

If installing a new TCD, continue with instructions in the 
TCD installation document through all wiring connections. 
When finished, continue with instructions below, 

“Installing 

the TCD-to-FID Series Connector"

on page 8, in this 

document.

C A U T I O N

GC insulation is made of refractory ceramic fibers. Ventilate your work 
area. Wear long sleeves, gloves, safety glasses, and a disposable 
dust/mist respirator. Dispose of unneeded insulation in a sealed 
plastic bag.

TCD vent tube

TCD column or make up gas fitting

Summary of Contents for G4319A

Page 1: ...ector must be removed and replaced To achieve a standard factory configuration the TCD must be located in the front detector position If you are installing a new FID at this time refer to its installa...

Page 2: ...or assembly Swage nuts and ferrules Tools Electrostatic protection such as a grounded wrist strap T 20 Torx screwdriver 7 16 inch wrench Steps 1 Preparing the GC 2 Raising the TCD Block 3 Adjusting Ve...

Page 3: ...and then sliding the cover to the left to free its right hinge pin Perform this procedure only if necessary to add a new detector or to remove and replace an existing detector Remove the panels indic...

Page 4: ...off 3 Remove the back panel by removing two screws at its bottom edge loosening two screws at its top edge and the lifting off the two top screws 4 Finally remove the rear top cover by removing four s...

Page 5: ...ion Guide TCD to FID Series Connection 5 3 Cap the vent tube at the top of the detector Thermal cover Insulation Delta PRT sensor Vent tube Heater and PRT Vent tube support Retaining screw Detector ba...

Page 6: ...installed into the top of the oven remove the retaining screw securing the vent tube support and remove the support 2 Carefully bend the vent tube downwards to be alongside the detector column make up...

Page 7: ...to pack around the bottom and sides of the detector The goal is to fill all voids around the detector body as it is placed into the cavity 6 Remove caps from the detector base and from the vent tube...

Page 8: ...t and Vespel ferrule to install the 1 4 to 1 8 inch adapter into the FID 3 Again following proper swaging procedures use the 1 8 inch brass tubing nut back ferrule and front ferrule to connect the TCD...

Page 9: ...tion Guide TCD to FID Series Connection 9 4 Restore gas supplies and following leak test procedures described in the Maintenance and Troubleshooting manual check for leaks particularly at all new conn...

Page 10: ...hai 200131 P R China Safety Notices CAUTION A CAUTION notice denotes a hazard It calls attention to an operating procedure practice or the like that if not correctly performed or adhered to could resu...

Reviews: