276
Chapter 9
BERT
Measuring RF Loopback BERT with Option 300
Figure 9-7
5. Turn off the BCH signal. and set up the base station to send the TCH signal.
6. Set up the base station and start sending the TCH signal now. The TCH is only required to contain a
valid midamble.
7. On the ESG, press
Configure Measurement
>
Timeslot #
>
2
>
Enter
.
This sets the ESG to expect the TCH in timeslot 2.
8. Press
Return
>
Synchronize to BCH/TCH/PDCH
to begin synchronization to the TCH.
NOTE
For the EDGE format, do the following to achieve
TCH Sync Lock
:
Press
Configure Measurement
>
Timeslot #
>
2
>
Enter
>
Return
>
Adjust Gain
.
Then you will see
Synchronizing to TCH
flashing on the display followed by the
Synchronizing
to PN
message.
Once synchronization is achieved, the
Ready TCH Sync Lock
message is displayed. Refer to
.
Summary of Contents for E4428C
Page 22: ...Contents xxii ...
Page 224: ...200 Chapter 4 Basic Digital Operation Creating and Using Bit Files ...
Page 228: ...204 Chapter 5 AWGN Waveform Generator Configuring the AWGN Generator ...
Page 229: ...205 6 Analog Modulation ...
Page 276: ...252 Chapter 7 Digital Signal Interface Module Operating the N5102A Module in Input Mode ...
Page 286: ...262 Chapter 8 Bluetooth Signals Turning On a Bluetooth Signal ...
Page 330: ...306 Chapter 9 BERT Verifying BERT Operation ...
Page 366: ...342 Chapter 10 CDMA Digital Modulation IS 95A Modulation ...
Page 394: ...370 Chapter 12 Multitone Waveform Generator Applying Changes to an Active Multitone Signal ...
Page 468: ...444 Chapter 15 W CDMA Digital Modulation for Component Test W CDMA Frame Structures ...
Page 667: ...643 18 Troubleshooting ...
Page 700: ...Index 676 Index ...