![Agilent Technologies Agilent 7890 Series Maintenance Manual Download Page 285](http://html.mh-extra.com/html/agilent-technologies/agilent-7890-series/agilent-7890-series_maintenance-manual_2867996285.webp)
Maintaining the NPD
14
Maintaining Your GC
285
To Check the NPD Leakage Current
1
Load the analytical method.
2
Set the
NPD Adjust Offset
to
Off
and the
Bead Voltage
to
0.00 V
.
•
Leave the NPD at operating temperature
•
Leave flows on or off
3
Press
[Front Detector]
or
[Back Detector]
, then scroll to
Output
.
4
Verify that the output (leakage current) is stable and
< 2.0 pA.
The output should slowly drop towards 0.0 pA, and
should stabilize in the
tenths
of a picoamp. Current
> 2.0pA indicates a problem.
Summary of Contents for Agilent 7890 Series
Page 1: ...Agilent Technologies Agilent 7890 Series Gas Chromatograph Maintaining Your GC ...
Page 28: ...28 Maintaining Your GC 3 Maintaining the GC ...
Page 74: ...74 Maintaining Your GC 6 Maintaining the Purged Packed Inlet 1 2 mm ...
Page 100: ...100 Maintaining Your GC 6 Maintaining the Purged Packed Inlet ...
Page 126: ...126 Maintaining Your GC 7 Maintaining the COC Inlet ...
Page 150: ...150 Maintaining Your GC 8 Maintaining the MMI ...
Page 176: ...176 Maintaining Your GC 9 Maintaining the PTV Inlet ...
Page 186: ...186 Maintaining Your GC 10 Maintaining the VI ...
Page 194: ...194 Maintaining Your GC 10 Maintaining the VI ...
Page 208: ...208 Maintaining Your GC 11 Maintaining the FID ...
Page 258: ...258 Maintaining Your GC 13 Maintaining the uECD ...
Page 271: ...Maintaining the NPD 14 Maintaining Your GC 271 ...
Page 288: ...288 Maintaining Your GC 14 Maintaining the NPD ...
Page 306: ...306 Maintaining Your GC 15 Maintaining the FPD ...
Page 328: ...328 Maintaining Your GC 17 Maintaining the Aux EPC ...
Page 334: ...334 Maintaining Your GC 18 Maintaining the PCM ...
Page 348: ...348 Maintaining Your GC 19 Maintaining a Valve ...
Page 353: ...Swagelok Connections 20 Maintaining Your GC 353 Figure 14 Completed fitting ...