![Agilent Technologies 8890 Maintaining Manual Download Page 110](http://html.mh-extra.com/html/agilent-technologies/8890/8890_maintaining-manual_2867678110.webp)
7
Maintaining the COC Inlet
To Change a Septum on the COC Inlet
110
Maintaining Your GC
To Change a Septum on the COC Inlet
1
Gather the following:
•
Replacement septum, see
“Consumables and Parts for the Cool On-Column Inlet”
•
Tweezers
•
A thin wire (0.2-inch diameter) for removing septum from inlet
•
Lint-free gloves
2
Launch the GC maintenance wizard:
Maintenance > Inlets,
select the inlet, then select
Perform Maintenance > Replace Septum > Start Maintenance.
The wizard will walk
through the steps needed to replace the septum (those same steps are repeated below).
WARNING
Be careful! The oven and/or inlet may be hot enough to cause burns. If either is hot, wear
heat-resistant gloves to protect your hands
.
CAUTION
Wear clean, lint-free gloves to prevent contamination of parts with dirt and skin oils.
3
Replace the septum.
•
If you are using a septum nut, grasp the knurling and unscrew. Remove the old septum
with tweezers.
•
Use tweezers to install a new septum. Push the septum into the septum nut until
properly seated. Firmly tighten the nut.
•
If you are using a cooling tower, grasp the three rings and unscrew. The spring and
duckbill septum may pop out of the inlet when you remove the cooling tower. Be careful
not to lose them. If they do not pop out, use a thin wire to remove them from the inlet.
Insert the replacement duckbill septum into the spring and place in the inlet. Reattach
the cooling tower assembly, then finger-tighten.
For 250/320-µm
automated injections
For 530-µm automated
injections
Summary of Contents for 8890
Page 1: ...Agilent 8890 Gas Chromatograph Maintaining Your Gas Chromatograph GC ...
Page 8: ...8 Maintaining Your GC ...
Page 22: ...2 Removing Covers To Remove the Electronics Cover 22 Maintaining Your GC ...
Page 142: ...8 Maintaining the MMI To Bakeout Contaminants from the MMI 142 Maintaining Your GC ...
Page 178: ...10 Maintaining the VI To Bakeout Contaminants from the VI Inlet 178 Maintaining Your GC ...
Page 208: ...12 Maintaining the TCD To Bakeout Contaminants from the TCD 208 Maintaining Your GC ...
Page 240: ...14 Maintaining the ECD To Bakeout the ECD 240 Maintaining Your GC ...
Page 264: ...16 Maintaining EPC Modules Installing or Replacing Frits in the PCM 264 Maintaining Your GC ...
Page 276: ...17 Maintaining a Valve To Install the Upper Valve Box 276 Maintaining Your GC ...