ACC Wall Mounting Procedures and Power Installation
8-8
ACC Wall Mounting Procedures and Power Installation
Plywood Panel Mounting Procedures — Customer’s Responsibility
If you are not rack mounting the ACC, it must be mounted directly to a
plywood panel that is securely fastened to the wall surface. The plywood
panel minimum dimensions are 50.8 cm high x 50.8 cm wide x 1.9 cm deep
(20 in. by 20 in. by 3/4 in.). You must also use the wall mount kit.
Since wall constructions vary from hospital to hospital, it is the customer’s
responsibility to provide the plywood wall panel and fasten it to the wall
surface at the chosen ACC installation site. It must be mounted with the
cables entering from the side.
ACC Wall Mounting Procedures
It is Agilent Technologies’ responsibility to mount the ACC to the plywood
panel at the chosen location.
a. Orient the mount on the wall so that the ACC has its connection ports
pointing towards either side.
b. Using the wall mount, measure and mark on the plywood panel where
the holes will be located. Drill a #28 hole (size 0.14 in.) at each location.
Make sure the holes are level from the top of the plywood panel.
c. Positing the wall mount over the pre-drilled holes and screw a #10
wood screw into each hole.
d. Mount the ACC onto the wall mount and secure with the rack screws.
Figure 8-2. ACC shown with wall mount
Note
Never mount the ACC with the ports facing up or down as this could cause
damage to the cables or connections.
ACC Rests on
Support
Use Rack Screws To
Secure ACC to Wall
Mount
Summary of Contents for 78581B
Page 46: ...ACC Maintenance 4 2 ...
Page 54: ...Installation Responsibilities Customer and Agilent Technologies 6 4 ...
Page 90: ...Procedures 8 28 ...
Page 98: ...Contacts 10 6 ...