
240
Programmed Temperature Vaporization Inlet (PTV)
Replacement procedures
30 of 46
Jun 2001
Agilent 6890 Gas Chromatograph Service Manual
Figure 240-19
Removing the carrier gas line
5.
Reconnect the carrier gas line.
6.
Check all connections on the sampling head for leaks. If necessary, tighten
them again by hand.
Cleaning the septumless head
Minor deposits from sample mixtures can collect in the head. Dust and
abraded material particles can enter together with the syringe needle,
eventually causing leaks.
1.
Disconnect the carrier gas line and unscrew the head from the inlet.
2.
Unscrew the sealing element from the head. Carefully remove the Viton
seal and the pressure spring. Do
not
use a sharp object to extract the
valve body—this can leave scratches that cause leaks.
Summary of Contents for 6890 Series
Page 1: ...6890 Series Gas Chromatograph Service Manual ...
Page 2: ...6890 Series Gas Chromatograph Service Manual ...
Page 27: ...24 of 24 Jun 2001 Contents Contents Agilent 6890 Gas Chromatograph Service Manual ...
Page 29: ......
Page 39: ......
Page 207: ......
Page 391: ......
Page 459: ......
Page 493: ......
Page 521: ......
Page 523: ......
Page 580: ...900 Remote Access Remote Access information was not available for this printing ...
Page 581: ......
Page 583: ......
Page 631: ......
Page 677: ......
Page 737: ......