
230
Cool On-Column Inlet
Leak testing EPC and manual inlets
18 of 20
Jun 2001
Agilent 6890 Gas Chromatograph Service Manual
Figure 230-11
EPC module serviceable parts
Correcting leaks
1.
Use an electronic leak detector to check all areas of the inlet that are
potential sources of a leak.
2.
Tighten loose connections to correct leaks, if necessary. You may need
to repeat the leak test.
3.
If the pressure drop is now 0.5 psi or less, you can consider the inlet
system leak-free. If the pressure drops faster than the acceptable rate,
continue to search for leaks and repeat the pressure test.
Aluminum bracket
Supply fitting
O-ring
Septum purge fitting
Caution
Aluminum bracket removed
for clarity, DO NOT completely
remove the bracket during
valve replacement.
0-rings
Summary of Contents for 6890 Series
Page 1: ...6890 Series Gas Chromatograph Service Manual ...
Page 2: ...6890 Series Gas Chromatograph Service Manual ...
Page 27: ...24 of 24 Jun 2001 Contents Contents Agilent 6890 Gas Chromatograph Service Manual ...
Page 29: ......
Page 39: ......
Page 207: ......
Page 391: ......
Page 459: ......
Page 493: ......
Page 521: ......
Page 523: ......
Page 580: ...900 Remote Access Remote Access information was not available for this printing ...
Page 581: ......
Page 583: ......
Page 631: ......
Page 677: ......
Page 737: ......