Installation - 14
Figure 7
SMEMA Connections at Loader Assemblies (Side
View)
7.
Lead Panel Installation
— The lead panels are
shipped on top of the loaders, one for each side.
Install the lead Panels (E7200-00616) inside the
main unit above where the loader shelf attaches.
The lead panels are secured to the shelf using four
10-32 allen head safety screws (2940-0304) and
washers (3050-1909) using the special tool
provided (8710-2683 or 8710-2693).
The tools have two part numbers. The one used
depends on which type of screws and tools are
shipped. The different screws will have the same
part number.
IMPORTANT
The Lead Panels are interchangeable. You must be certain
that the lead panels are positioned tightly against the outer
cabinet wall to prevent radiation leakage. If only one
loader is used (pass back system), only one panel will be
installed.
MAIN UNIT
LEFT LOADER
RIGHT LOADER
SMEMA connectors
Summary of Contents for 5DX II Series
Page 4: ... iv ...
Page 14: ......
Page 57: ...Installation 43 Installation INSTALLATION NOTES ...
Page 58: ...Installation 44 ...
Page 74: ...Appendix A 60 ...
Page 80: ...Appendix B 66 ...