©
Agilent Technologies 1989–2002
Agilent 3070 / 79000 Site Preparation
10-104
Chapter 10: Site Preparation – Power Requirements for Older Systems: Series 3 Power Requirements and Connections (Prior to May 2000)
120/208–127/220 V Single-Phase Wye with Neutral
(AWV, AWZ)
Figure 10-64
120/208–127/220 V 3-Phase Wye with neutral (AWW, 05E), 120/208–127/220 V Single-phase Wye with neutral
(AWV, AWZ)
L3
L2
L1
N
N
10A 10A
G
1
0
T3
T2
T1
G
Connect Input
Line here
Note: Install jumper between T2 and T3 for Single-Phase
option for E1135C.
* Neutral is required only for POTS and xDSL Bay
L1
L3
L2
N*
G
L1
L2
G
N*