background image

Operation

Step-by-step

instructions

on

how

to

make

a

measurement

with

the

16089E

are

as

follows:

1.

Set

the

instrument's

Cable

Length

setting

to

1

m.

2.

Connect

the

16089E

to

the

instrument's

UNKNOWN

terminals

.

Figure

2-2.

Connecting

the

T

est

Leads

3.

P

erform

the

OPEN

and

SHORT

compensation

as

described

in

the

instrument's

operation

manual.

Figure

2-3

shows

how

to

make

the

short

condition

for

the

SHORT

compensation.

4.

Connect

the

DUT

to

the

test

clips

.

Operation

2-3

Summary of Contents for 16089E

Page 1: ...Agilent 16089E Kelvin Clip Leads Operation Note Agilent Part No 16089 90001 Printed in JAP AN May 2000...

Page 2: ...by copyright All rights are reserved No part of this document may be photocopied reproduced or translated to another language without the prior written consent of the Agilent Technologies Agilent Tec...

Page 3: ...ss another person capable of rendering rst aid and resuscitation is present DO NOT Substitute Parts Or Modify Instrument Because of the danger of introducing additional hazards do not install substitu...

Page 4: ...ucts returned to Agilent Technologies from another country Agilent Technologies warrants that its software and rmware designated by Agilent Technologies for use with an instrument will execute its pro...

Page 5: ...LCR meters and impedance analyzers 4263B 4278A 4284A 4285A 4192A 4194A The 16089E makes it possible to measure odd shaped components that cannot be measured with conventional test xtures The 16089E c...

Page 6: ...onnected or disconnected Protect them from ESD damage by wearing a grounding strap that provides a high resistance path to ground Alternatively ground yourself to discharge any static charge built up...

Page 7: ...Temperature 0 to 55 C Operating Humidity 95 RH 40 C Non operating Temperature 040 to 70 C Non operating Humidity 95 RH 40 C Cable Length approximately 1 m 1 Except for the frequency range over 100 kH...

Page 8: ......

Page 9: ...notify the carrier and Agilent Technologies Your Agilent Technologies sales o ce will arrange for repair and replacement without waiting for the claim to be settled 1 Inspect the shipping container fo...

Page 10: ...ensing Packaging the Test Leads If shipment to a Agilent Technologies service center is required each test lead set should be repackaged using the original factory packaging materials Alteratively com...

Page 11: ...h setting to 1 m 2 Connect the 16089E to the instrument s UNKNOWN terminals Figure 2 2 Connecting the Test Leads 3 Perform the OPEN and SHORT compensation as described in the instrument s operation ma...

Page 12: ...on measurement accuracy the instrument s OPEN and SHORT compensation capabilities must be used The procedures are described in the instrument s operation manual Figure 2 3 Making a Shorting Condition...

Page 13: ...ope Agilent Technologies Test Measurement European Marketing Organization P O Box 999 1180 AZ Amstelveen The Netherlands tel 31 20 547 9999 Japan Agilent Technologies Japan Ltd Call Center 9 1 Takakur...

Reviews: