Remove the connector screws from the GPIB, Remote and from the analog
pressure output connector.
5
Remove the board. Place it on an ESD kit.
6
In most cases the RFI spring plate (Radio Frequency Interference spring
plat, prevents radio emissions from the instrument to ambient) remains on
the interface connectors of the board. Carefully remove the spring plate
from the old board and slide onto the new board before installing the new
board in the pump (the RFI spring plate is NOT part of an exchange board).
Figure 22
Board Layout of the NPM Board
S1
J1
J2
J3
J4
J6
P2
P8
P20
P22
P21
P16
P17
P15
P18
P9
P11
J5
P19
P14
P12
WA R N I N G
The RFI spring plate sitting on the board connectors is very sharp! Be careful, not to
cut yourself, when removing it from the old board and sliding it onto the new board.
Summary of Contents for 1100 Series
Page 1: ...s1 Agilent 1100 Series Nano Pump Service Manual ...
Page 4: ...iv 1100 Series Nano Pump Service Manual ...
Page 12: ...xii 1100 Series Nano Pump Service Manual Agilent Technologies on Internet 269 Index 271 ...
Page 32: ...20 1100 Series Nano Pump Service Manual 1 Installing the Pump ...
Page 114: ...102 1100 Series Nano Pump Service Manual 2 Troubleshooting and Test Functions ...
Page 204: ...192 1100 Series Nano Pump Service Manual 4 Parts and Materials ...
Page 242: ...230 1100 Series Nano Pump Service Manual 5 Introduction to the Nano Pump ...
Page 265: ...1100 Series Nano Pump Service Manual 253 Control Module Screens for the Nano Pump 6 ...
Page 272: ...260 1100 Series Nano Pump Service Manual 7 Specifications ...
Page 282: ...270 1100 Series Nano Pump Service Manual A Safety Information ...
Page 287: ......